Appendix E (Continued)
Part Number: 5000619
5/16”
flange nut
MLPE
bracket
5/16” bolt
MLPE
5/16”
flange nut
MLPE
bracket
5/16”
bolt
MLPE
5/16”
flange nut
MLPE bracket
5/16”
bolt
ALERT
:
MLPE must be a minimum of 3” away from
the roof, and at least 1.5” from the back sheet of
the module.
MLPE
Solar Edge Installation
Enphase Installation
Tigo Energy Installation
Solar Edge Allowed Installation Locations:
A
Enphase Allowed Installation Locations:
B, C
Tigo Allowed Installation Locations:
A, B, C
ALERT:
Must be Flush
Yotta Energy Installation
3”
3”
Yotta’s
Dual Power Inverter and SolarLeaf are positioned and
installed in the same location as Ballast in the clawFRplus System.
The Rails are to be installed at the location closer to the Cam
Bracket or the portrait ballast installation position. All fasteners
used to install the Dual Power Inverter or SolarLeaf, including any
fasteners removed for installation should be torqued to
6ft-lb.
Alert
: When SolarLeafs are installed, they become a critical
component of the Main Wind Force Resisting System. If SolarLeafs
are removed, quantity 2 4
”x
8
”x
16
”
Nominal 32.6 lbs Ballast Blocks
must be placed in these locations.
Alert
: SolarLeaf
is to be positioned so it is outside of the 3” module
centerline keep out zone.
Alert
: See
Yotta’s
Installation manuals for full installation
instructions on both the Dual Power inverter and SolarLeaf
Keep Out
Zone