P&M QUIK-GTR Manual, ref. QUIK-GTR Man 1.0.doc
Page 37
9. Ensure that the cord between the two crossboom tensioning pulleys is not tangled. Using the pulley cord, pull
back the crossboom until the sail is just under tension. Check, by observing through the inspection zips and the
outer washout rod Velcro panels, that the washout rods are moving correctly into place and that the actuating
cords are not tangled. If necessary, lift the sail trailing edge to assist movement or reach into the inspection zips
and lift the washout rods over the crossbooms. Check the inner washout rod cord and the outer washout rod cord
have free runs without tangling.
10. Pull up the crossboom till the keyhole tang can be located on the restraint cable stud. If you meet any
sudden resistance during the tensioning process, stop and investigate, the pulley system multiplies the pulling
force by 6:1. (The end thrust in the crossboom is multiplied a further 4.5 times). Fit the safety pin to the
crossboom restraint stud.
Rigging tool shown inserted in rear of keel.
Make sure that:
a) The tang is located in the stud recess.
b) The tensioner cables are not twisted.
c) The safety pin secures the cable onto the stud and is re-fitted correctly into restraint cable stud.
Damage to airframe components, the sail and fittings
may result if you tension the crossboom with rigging
or airframe components caught up. Investigate
immediately if undue resistance is felt. Remember,
the pulley system multiplies the force applied to the
cables by 6.
CAUTION
Содержание QUIK-GTR
Страница 73: ...P M QUIK GTR Manual ref QUIK GTR Man 1 0 doc Page 73...
Страница 87: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 87...
Страница 89: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 89...
Страница 90: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 90...
Страница 91: ......
Страница 94: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 94...
Страница 95: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 95...