P&M QUIK-GTR Manual, ref. QUIK-GTR Man 1.0.doc
Page 39
Rigging stage 12
– correct positioning of washout rods.
14.Fit the undersurface battens and secure them with the single bungees.
Rigging stage 13
15.Engage each tip fin on the leading edge spigot and then attach the two clevis pins with nylon washers
and safety clips.
Содержание QUIK-GTR
Страница 73: ...P M QUIK GTR Manual ref QUIK GTR Man 1 0 doc Page 73...
Страница 87: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 87...
Страница 89: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 89...
Страница 90: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 90...
Страница 91: ......
Страница 94: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 94...
Страница 95: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 95...