12
ENGLISH
TEST RUN
8
1. Before test run, make sure below items have been checked:-
a) Pipework are properly done.
b) Electric cable connecting work are properly done.
c) Tank Unit is fi lled up with water and trapped air is released.
d) Please turn on the power supply after fi lling the tank until full.
2. Switch ON the power supply of the Tank Unit. Set the Tank
Unit RCCB /ELCB to “ON” condition. Then, please refer to the
Operation Instruction for operation of Remote Controller
1
.
3. For normal operation, Water Pressure Gauge
d
reading should
be in between 0.05 MPa and 0.3 MPa. If necessary, adjust the
Water Pump
2
SPEED accordingly to obtain normal water
pressure operating range. If adjust Water Pump
2
SPEED
cannot solve the problem, contact your local authorized dealer.
4. After test run, please clean the Magnetic Water Filter Set
6
.
Reinstall it after fi nish cleaning.
CHECK WATER FLOW OF WATER CIRCUIT
Confi rm the maximum water fl ow during main pump operation not
less than 15 l/min.
*Water fl ow can be check through service setup (Pump Max Speed)
[Heating operation at low water temperature with lower water fl ow
may trigger “H75” during defrost process.]
RESET OVERLOAD PROTECTOR
9
Overload Protector
9
a serves the safety purpose to prevent the
water over heating. When the Overload Protector
9
a trip at high
water temperature, take below steps to reset it.
1. Take out the cover.
2. Use a test pen to push the centre button gently in order to reset
the Overload Protector
9
.
3. Fix the cover to the original fi xing condition.
Use test pen to push
this button for reset
Overload protector
9
.
MAINTENANCE
9
•
In order to ensure safety and optimal performance of the Tank Unit,
seasonal inspections on the Tank Unit, functional check of RCCB/
ELCB, fi eld wiring and piping have to be carried out at regular
intervals. This maintenance should be carried out by authorized
dealer. Contact dealer for scheduled inspection.
Maintenance for Magnetic Water Filter Set
6
1. Turn OFF power supply.
2. Set the two valves for the Magnetic Water Filter Set
6
to “CLOSE”.
3. Drain the Space Heating / Cooling circuit water with set the Pressure
Relief Valve
b
lever UP, so that water pressure drop below 0.5 bar.
4. Take off the clip, then gently pull out the mesh. Beware of small
amount water drain out from it.
5. Clean the mesh with warm water to remove all the stain. Use soft
brush if necessary.
6. Remove the bolt with magnet on brass cap with screwdriver to
remove all iron powder.
7. Reinstall the magnet and mesh to the Magnetic Water Filter Set
6
and set back the clip on it.
8. Set the two valves for the Magnetic Water Filter Set
6
to “OPEN”.
9. Re-charging the water to Space Heating / Cooling circuit (refer
Section 5 for details.)
10. Turn ON power supply.
Maintenance for Temperature and Pressure Relief Valve
j
•
Manually operate the Temperature and Pressure Relief Valve
j
by turn the knob counter clockwise to ensure free water fl ow through
discharge pipe at regular intervals to ensure it is not blocked and
to remove lime deposit.
PROPER PUMP DOWN PROCEDURE
WARNING
Strictly follow the steps below for proper pump down procedure.
Explosion may occur if the steps are not followed as per sequence.
1. When the Tank Unit is not in operation (standby), enter the
Service setup menu in the Remote Controller and select Pump
down operation to turn it ON. (See APPENDIX for detail)
2. After 10~15 minutes, (after 1 or 2 minutes in case very low
ambient temperatures (< 10°C)), fully close 2 way valve on
Outdoor Unit.
3. After 3 minutes, fully close 3 way valve on Outdoor Unit.
4. Press the “OFF/ON” switch on the Remote Controller
1
to stop
pump down operation.
5. Remove the refrigerant piping.
TECHNICAL DATA
•
Model
WH-ADC0309J3E5UK
•
Tank Capacity
- Nominal
•
- Actual
200 L
185 L
•
Weight
- Empty
- Full
122 k
g
307 k
g
•
Maximum Operating Pressure
- Primary
- Secondary
3.0 bar
3.5 bar
•
Maximum Operating Temperature
65°C
•
Operating Pressure
- Tank Unit
- Expansion Relief Valve
3.5 bar
8.0 bar
•
Maximum Working / Design Pressure
- Space Heating / Cooling
- Tank Circuit
3.0 bar
10.0 bar
•
Standing Heat Loss
1.35 kWh/24h
•
Reheat Time
87m 54s
•
Temperature and Pressure Relief Valve
- Size
- Pressure Relief
- Temperature Relief
1
/
2
" x 15mm
10 bar
90°C - 95°C
•
Primary Heater Pressure Drop
0.2 bar
•
Primary Flow Rate (Nominal)
9.2 - 25.8 L/min
•
Primary Heating Power Input / Flow Rate
32.2 kW /
15 L/min
•
Hot Water Capacity as per EN 12897
177 L
This Tank Unit comply with EN 12897.
COLK100080 - Panasonic G3 Unvented Control Kit
Part Code
Description
WRAS Approval Number
CWIC355045
COMPACT INLET CONTROL
2.1/8.0 BAR
1702335
TUND219005
15*22MM TUNDISH SLIMLINE
STRAIGHT BLACK
1805353
XVES050052
18L VERT POT VESSEL WHITE
2.2B
1102334
ZKIT510506
OSO HOTWATER ACCESSORY
PACK
912308
HOSE202106A
3
/
4
" BSP HOSE C/W SEALING
WASHER-1000mm
1012358
Содержание WH-UD03JE5
Страница 36: ...Printed in the Czech Republic ACXF60 37631 AB ...