6
ENGLISH
SELECT THE BEST LOCATION
1
Before choosing the installation site, obtain user approval.
Install the Tank Unit in indoors with frost free weather proof
location only.
Must install on a fl at horizontal and solid hard surface.
There should not be any heat source or steam near the Tank Unit.
A place where air circulation in the room is good.
A place where drainage can be easily done
(e.g. Utility room).
A place where Tank Unit’s operation noise will not cause discomfort
to the user.
A place where Tank Unit is far from door way.
A place where accessible for maintenance.
Ensure to keep minimum distance of spaces as illustrated below
from wall, ceiling, or other obstacles.
A place where fl ammable gas leaking might not occur.
Secure the Tank Unit to prevent it being knocked over accidentally
or during earthquakes.
Please avoid installations which expose the Tank Unit to any of the
following conditions:
Extraordinary environment conditions; installation in frost or
exposure to unfavorable weather conditions.
Voltage input exceeding the specifi ed voltage.
Required space for installation
(Unit : mm)
Min.
100
Min.
700
Min.
350
Min.
100
Min.
100
Transport and Handling
•
Be careful during transportating the unit so that it is not damaged
by impact.
•
Only remove the packaging material once it
has reached it is desired installation location.
•
It may need three or more people to carry
out the installation work. The weight of Tank
Unit might cause injury if carried by
one person.
•
The Tank Unit can be transported
either in vertical or horizontal.
-
If it transported in horizontal, make
sure Front of packaging material
(printed with “FRONT”) must facing
upwards.
-
If it transported in vertical, use the hand holes on sides, slide
and move to the desired location.
•
Fix the Adjustable Feet
1
, if the Tank unit installed on a uneven
surface.
Hold
Hold
Hold arrow section
to slide and move
TO DRILL A HOLE IN THE WALL
AND INSTALL A SLEEVE OF
PIPING
2
1. Make a Ø70 mm through hole.
2. Insert the piping sleeve to the hole.
3. Fix the bushing to the sleeve.
4. Cut the sleeve until it extrudes about 15 mm from the wall.
CAUTION
When the wall is hollow, please be sure to use the sleeve for
tube assembly to prevent dangers caused by mice biting the
connection cable.
5. Finish by sealing the sleeve with putty or caulking compound at
the fi nal stage.
15 mm
Putty or caulking compound
ø70 mm through hole
Indoor
Outdoor
Sleeve for tube
assembly
Approx. 5 - 7 mm
Bushing for tube assemblys
Wall
PIPING INSTALLATION
3
WATER QUALITY
REQUIREMENT
Must use water that complies with European water quality standard
98/83 EC. The lifespan of the Tank Unit will be shorter if groundwater
(include spring water and well water) is used.
The Tank Unit shall not be used with the tap water containing
contaminants such as salt, acid, and other impurities which may
corrode the tank and its component.
Typical Piping Installation
Main
Water
Supply
Faucet
Fan Coil Unit
2-Way Valve
Tab /
Shower
Air-to-Water Heatpump
Outdoor Unit
Pressure
Relief
Valve
Drainage
Expansion
Vessel
Radiator /
Floor Heater
Tank Water
Discharge
Tundish
Pressure
Reducing
Valve
Shut
Off
Valve
Check
Valve
Drain
Water
T&P Valve Drainage
Tundish
Содержание WH-UD03JE5
Страница 36: ...Printed in the Czech Republic ACXF60 37631 AB ...