SELECT THE BEST LOCATION

1

Before choosing the installation site, obtain user approval.

Install the Tank Unit in indoors with frost free weather proof 
location only.

Must install on a fl at horizontal and solid hard surface.

There should not be any heat source or steam near the Tank Unit.

A place where air circulation in the room is good.

A place where drainage can be easily done
(e.g. Utility room). 
A place where Tank Unit’s operation noise will not cause discomfort 
to the user.

A place where Tank Unit is far from door way.

A place where accessible for maintenance.

Ensure to keep minimum distance of spaces as illustrated below 
from wall, ceiling, or other obstacles.

A place where fl ammable gas leaking might not occur. 

Secure the Tank Unit to prevent it being knocked over accidentally 
or during earthquakes. 

Please avoid installations which expose the Tank Unit to any of the 
following conditions:

Extraordinary environment conditions; installation in frost or 
exposure to unfavorable weather conditions.

Voltage input exceeding the specifi ed voltage.

Required space for installation

(Unit : mm)

Min.

 

100

Min.

 

700

Min.

 

350

Min.

 

100

Min.

 

100

Transport and Handling

 

Be careful during transportating the unit so that it is not damaged 
by impact.

 

Only remove the packaging material once it 
has reached it is desired installation location.

 

It may need three or more people to carry 
out the installation work. The weight of Tank 
Unit might cause injury if carried by 
one person.

 

The Tank Unit can be transported 
either in vertical or horizontal.

 

-

If it transported in horizontal, make 
sure Front of packaging material 
(printed with “FRONT”) must facing 
upwards.

 

-

If it transported in vertical, use the hand holes on sides, slide 
and move to the desired location.

 

Fix the Adjustable Feet 

1

, if the Tank unit installed on a uneven 

surface.

Hold

Hold

Hold arrow section 
to slide and move

TO DRILL A HOLE IN THE WALL 

AND INSTALL A SLEEVE OF 

PIPING

2

1.  Make a Ø70 mm through hole.
2.  Insert the piping sleeve to the hole.
3.  Fix the bushing to the sleeve.
4.  Cut the sleeve until it extrudes about 15 mm from the wall.

 

CAUTION

When the wall is hollow, please be sure to use the sleeve for 
tube assembly to prevent dangers caused by mice biting the 
connection cable.

5.  Finish by sealing the sleeve with putty or caulking compound at 

the fi nal stage.

15 mm

Putty or caulking compound

ø70 mm through hole

Indoor

Outdoor

Sleeve for tube 
assembly

Approx. 5 - 7 mm

Bushing for tube assemblys

Wall

PIPING INSTALLATION

3

WATER QUALITY 

REQUIREMENT

Must use water that complies with European water quality standard 
98/83 EC. The lifespan of the Tank Unit will be shorter if groundwater 
(include spring water and well water) is used. 

The Tank Unit shall not be used with the tap water containing 
contaminants such as salt, acid, and other impurities which may 
corrode the tank and its component.

Typical Piping Installation

Main 

Water 

Supply

Faucet

Fan Coil Unit

2-Way Valve

Tab /

Shower

Air-to-Water Heatpump 

Outdoor Unit

Pressure 

Relief 

Valve 

Drainage

Expansion 

Vessel

Radiator / 

Floor Heater

Tank Water 
Discharge

Tundish

Pressure 

Reducing 

Valve

Shut 

Off 

Valve

Check 

Valve

Drain 

Water

T&P Valve Drainage

Tundish

Содержание WH-UD03JE5

Страница 1: ... or over current will cause electrical shock or fire Do not tie up the power supply cord into a bundle by band Abnormal temperature rise on power supply cord may happen Keep plastic bag packaging material away from small children it may cling to nose and mouth and prevent breathing Do not use pipe wrench to install refrigerant piping It might deform the piping and cause the unit to malfunction Do ...

Страница 2: ... is any doubt about the installation procedure or operation always contact the authorized dealer for advice and information Select a location where in case of water leakage the leakage will not cause damage to other properties When installing electrical equipment at wooden building of metal lath or wire lath in accordance with electrical facility standard no electrical contact between equipment an...

Страница 3: ...Description Unit mc Total refrigerant charge in system kg mmax Maximum refrigerant charge allowed kg mexcess mc mmax kg H Installation height m VAmin Minimum ventilation opening area cm2 A Determine Maximum refrigerant charge allowed mmax 1 Calculate Installation Room Area Aroom 2 Based on Table I select mmax which corresponds to the calculated Aroom value 3 If mmax mc the unit can be installed in...

Страница 4: ...2 06 36 12 2 08 36 82 2 10 37 53 2 12 38 25 2 14 38 98 2 16 39 71 2 18 40 45 2 20 41 19 2 22 41 94 2 24 42 70 2 26 43 47 2 27 43 86 For H values lower than 0 6m the value of H is considered as 0 6m to comply to IEC 60335 2 40 2018 Clause GG2 For intermediate mc values the value that corresponds to the higher mc value from the table is considered Example If mc 1 85 kg the value that corresponds to ...

Страница 5: ...6 25 Siemens ii Room thermostat Wired PAW A2W RTWIRED AC230V Wireless PAW A2W RTWIRELESS iii Mixing valve 167032 AC230V Caleffi iv Pump Yonos 25 6 AC230V Wilo v Buffer tank sensor PAW A2W TSBU vi Outdoor sensor PAW A2W TSOD vii Zone water sensor PAW A2W TSHC viii Zone room sensor PAW A2W TSRT ix Solar sensor PAW A2W TSSO It is recommended to purchase the field supply accessories listed in above ta...

Страница 6: ... Unit can be transported either in vertical or horizontal If it transported in horizontal make sure Front of packaging material printed with FRONT must facing upwards If it transported in vertical use the hand holes on sides slide and move to the desired location Fix the Adjustable Feet 1 if the Tank unit installed on a uneven surface Hold Hold Hold arrow section to slide and move TO DRILL A HOLE ...

Страница 7: ...gas leak caused by freezing Apply neutral cure Alkoxy type and ammonia free silicone sealant along the circumference Neutral cure Alkoxy type ammonia free silicone sealant is only to be applied after pressure testing and cleaning up by following instructions of sealant only to the outside of the connection The aim is to prevent moisture from entering the connection joint and possible occurrence of...

Страница 8: ...re Relief Valve Drainage Pipework Connect a drain hose to the Pressure Relief Valve hose outlet h The hose must be installed in a continuously downward direction and left open to the frost free atmosphere If drain hose is long use a metal support fixture along the way to eliminate the wavy pattern of drain tube The water may drip from this discharge hose Therefore must guide the hose without close...

Страница 9: ...ating device must be connected to the power supply cable Isolating device disconnecting means should have minimum 3 0 mm contact gap Connect the approved polychloroprene sheathed power supply 1 cord and power supply 2 cord and type designation 60245 IEC 57 or heavier cord to the terminal board and to the other end of the cord to isolating device Disconnecting means See below table for cable size r...

Страница 10: ...r a clacking sound due to water drainage contact your local authorized dealer Push down the lever after finish checking In case the water keep on draining out from the Tank Unit switch off the system and then contact your local authorized dealer EXPANSION VESSEL 0 PRE PRESSURE CHECKING For Space Heating Cooling Expansion Vessel 0 with 10 L air capacity and initial pressure of 1 bar is installed in...

Страница 11: ...pprox 6 mm Remove the sheath Approx 180 mm Make sure the wiring connection is in the correct direction Clamper field supply Claw 2 places Wall to which the remote controller is fixed Mount the bottom case to the wall Connect the remote control wiring Arrange the wires along the groove of the case For embedded type Preparation Make 2 holes for screws using a driver UP Avoid the wire being caught Mo...

Страница 12: ...from it 5 Clean the mesh with warm water to remove all the stain Use soft brush if necessary 6 Remove the bolt with magnet on brass cap with screwdriver to remove all iron powder 7 Reinstall the magnet and mesh to the Magnetic Water Filter Set 6 and set back the clip on it 8 Set the two valves for the Magnetic Water Filter Set 6 to OPEN 9 Re charging the water to Space Heating Cooling circuit refe...

Страница 13: ...CIRCUIT CN1 2 WAY VALVE B BL BR 3 WAY VALVE CLOSE N OPEN M 1 CLOSE N OPEN ELCB EARTH LEAKAGE CIRCUIT B 1 CN TH2 WHT 4 TANK TEMP SENSOR 1 THERMISTOR TANK TEMP SENSOR 2 THERMISTOR t t L N ELCB ELECTRONIC CONTROLLER MAIN WATER OUTLET TEMP SENSOR THERMISTOR REFRIGERANT TEMP SENSOR THERMISTOR WATER INLET TEMP SENSOR THERMISTOR HEX WATER OUTLET TEMP SENSOR THERMISTOR TANK TEMP SENSOR 1 THERMISTOR TANK T...

Страница 14: ...e remote controller from Tank Unit and install it in the room where floor heating is installed This is an application that uses remote controller as Room Thermostat 3 External Room Thermostat Outdoor Room Thermostat Field supply Floor heating Indoor Connect floor heating or radiator directly to Tank Unit Remote controller is installed on Tank Unit Install separate external Room Thermostat field su...

Страница 15: ...ater temperature independently Install buffer tank thermistor on buffer tank It requires connection setting of buffer tank and T temperature setting at heating operation separately This system requires Optional PCB CZ NS4P Outdoor Radiator Thermistor 1 Thermistor 2 Buffer tank Pump 2 Pump 1 Mixing valve 1 Indoor Floor heating Connect floor heating or radiator to 2 circuits through buffer tank as s...

Страница 16: ...ontroller Indoor Outdoor Simple 2 zone Floor heating Radiator Thermistor 2 Thermistor 1 Pump 2 Mixing valve Indoor Outdoor Radiator This is an example of simple 2 zone control without using buffer tank Built in pump from Tank Unit served as a pump in zone 1 Install mixing valve pump and thermistor specified by Panasonic on zone 2 circuit Please be sure to assign high temperature side to zone 1 as ...

Страница 17: ...ture drops heat pump capacity is insufficient Boiler is connected parallel with heat pump against heating circuit Besides that an application that connects to the DHW tank s circuit to heat up tank s hot water is also possible Boiler output can be control by either SG ready input from optional PCB or Auto control by 3 modes selection pattern Operation setting of boiler shall be responsible by inst...

Страница 18: ... cord Indoor Unit Outdoor Unit Connecting cable For connection to Optional PCB 6 1 By connecting Optional PCB 2 Zone temperature control can be achieved Please connect mixing valves water pumps and thermistors in zone 1 and zone 2 to each terminals in Optional PCB Temperature of each zone can be controlled independently by remote controller 2 Pump zone 1 and zone 2 cable shall be 2 x min 1 5 mm of...

Страница 19: ...itch 50 External compressor switch 50 Connection of the main PCB Zone 1 room sensor Outdoor air sensor Tank sensor External control Remote controller Boiler contact Defrost Signal Extra pump H C N L C O N C O N Optional Thermostat 1 3 way valve 2 way valve Signal inputs Optional Thermostat L N AC230V Heat Cool Thermostat heat Cool terminal It does not function when using the Optional PCB External ...

Страница 20: ...unt it on the water piping by using the stainless steel metal strap and contact paste both are included 93 70 35 Dimensions mm 3 Outdoor sensor PAW A2W TSOD If the installation location of the outdoor unit is exposed to direct sunlight the outdoor air temperature sensor will be unable to measure the actual outdoor ambient temperature correctly In this case optional outdoor temperature sensor can b...

Страница 21: ... CN CNT cable Without Optional PCB CN CNT cable With Optional PCB 2 Insert a flat head screwdriver into the slot on the top of the adaptor and remove the cover Connect the other end of the CN CNT cable connector to the connector inside the adaptor Slot Connector 3 On the wall near the Tank Unit attach the adaptor by screwing screws through the holes in the back cover Screws 4 Pull the CN CNT cable...

Страница 22: ...g Set room temp Compensation curve Set direct water temp Set pool temp 4 Display Heat temp Display current heating temperature it is set temperature when enclosed by line 5 Display tank temp Display current tank temperature it is set temperature when enclosed by line 6 Outdoor temp Display outdoor temp 3 1 Remote Controller Outline A B C D G F E Name Function A Main screen Display information B Me...

Страница 23: ...f initial setting is not performed it does not go into menu Set language confirm Clock format 12 00am Mon 24h am pm Select Confirm When language is set setting screen of time display appears 24h am pm Set time display confirm Date time 12 00am Mon Year Month Day Hour Min 2015 01 01 12 00 Select Confirm YY MM DD Time setup screen appears Set YY MM DD Time confirm 12 00am Mon Start Back to initial s...

Страница 24: ...up 10 External SW Yes No 11 Only when the selection for Optional PCB is Yes Solar connection Yes No Tank setup Solar setup 12 Only when the selection for Optional PCB is Yes External Error signal Yes No 13 Only when the selection for Optional PCB is Yes Demand control Yes No 14 Only when the selection for Optional PCB is Yes SG ready Yes No Capacity setup 15 Only when the selection for Optional PC...

Страница 25: ...ect Direct temp setup T for Cooling ON T for cooling setup 28 Auto Outdoor temp for Heat to Cool Heat Cool change temp setup 29 Outdoor temp for Cool to Heat Cool Heat change temp setup 30 Tank Floor operation time max Max operation time for Heat Cool mode setup 31 Tank heat up time max Max operation time for Tank mode setup 32 Tank re heat temp Tank re heat temp setup 33 Sterilization Sterilizati...

Страница 26: ...ity Initial setting Depend on model System setup 12 00am Mon Optional PCB connectivity Zone Sensor Heater capacity Anti freezing Select Confirm If there is built in Heater set the selectable heater capacity NOTE There are models which cannot select heater 4 Anti freezing Initial setting Yes System setup 12 00am Mon Optional PCB connectivity Zone Sensor Heater capacity Anti freezing Select Confirm ...

Страница 27: ... please begin setting according to remote controller instruction Boiler icon will be displayed on remote controller top screen After Bivalent connection Set YES there is two option of control pattern to be select SG Ready Auto 1 SG ready Only available to set when optional PCB set to YES SG Ready input from optional PCB terminal control ON OFF of boiler and heat pump as below condition SG signal O...

Страница 28: ...al temp Heat pump Boiler In Advanced Parallel mode setting for both heating and tank can be made simultaneously During operation of Heating Tank mode when each time the mode is switched the boiler output will be reset to OFF Please have good understanding on the boiler control characteristic in order to select the optimal setting for the system 10 External SW Initial setting No System setup 12 00a...

Страница 29: ...0 4 8 8 3 1 3 4 9 5 1 50 8 4 8 6 85 1 4 1 6 15 5 2 55 50 8 7 90 85 1 7 20 15 5 3 8 8 1 8 5 4 5 6 55 8 9 9 1 90 1 9 2 1 20 5 7 60 55 9 2 95 90 2 2 25 20 5 8 9 3 2 3 5 9 6 1 60 9 4 9 6 95 2 4 2 6 25 6 2 65 60 9 7 100 95 2 7 30 25 6 3 9 8 2 8 6 4 6 6 65 9 9 100 2 9 3 1 30 6 7 70 65 A minimum operating current is applied on each model for protection purpose 0 2 voltage hysteresis is provided The value...

Страница 30: ...SW Select Confirm Able to switch fix heating cooling by external switch Open Fix at Heating Heating DHW Short Fix at Cooling Cooling DHW NOTE This setting is disabled for model without Cooling NOTE Does not display if there is no Optional PCB Timer function cannot be used Cannot use Auto mode 18 Force Heater Initial setting Manual System setup 12 00am Mon External compressor SW Circulation liquid ...

Страница 31: ...e operation If pump flowrate setting is set to Max duty unit will set the pump duty to the set duty at Pump maximum speed in service setup menu during room side operation 3 4 Operation Setup Heat 22 Water temp for heating ON Initial setting compensation curve 35 C 5 C 15 C 55 C Hot water temperature compensation curve Outdoor temperature Decide temperature of 4 points as shown in diagram Set targe...

Страница 32: ... Water temp for cooling ON Initial setting compensation curve 20 C 30 C 5 C 20 C compensation curve Set target water temperature to operate cooling operation Compensation curve Target water temperature change in conjunction with outdoor ambient temperature change Direct Set direct circulation water temperature In 2 zone system zone 1 and zone 2 water temperature can be set separately 27 T for cool...

Страница 33: ...ting 60min Heat Tank 5min 4h Set max boiling hours of tank When max boiling hours are shortened it immediately returns to Heating operation but it may not fully boil the tank 32 Tank re heat temp Initial setting 8 C 12 C 2 C Set temp to perform reboil of tank water When boiled by heat pump only 51 C Tank re heat temp shall become max temp Setting range is 12 C 2 C 33 Sterilization Initial setting ...

Страница 34: ...own ON Confirm Pump down operation in progress OFF Operate pump down operation 36 Dry concrete 30 C 1 2 3 4 5 6 35 C 35 C 40 C 40 C 45 C Stage Operate concrete curing operation Select Edit set temp for every stage 1 99 1 is for 1 day Setting range is 25 55 C When it is turned ON dry concrete starts When it is 2 zone it dries both zones 37 Service contact Contact 1 Bryan Adams ABC abc 0 9 Other A B...

Страница 35: ...l 4 Reset password Reset password Custom menu Setting method of Custom menu Custom menu 12 00am Mon Cool mode Back up heater Reset energy monitor Reset operation history Smart DHW Select Confirm Please press for 10 sec Items that can be set 1 Cool mode Set With Without Cooling function Default is without NOTE As with without Cool mode may affect electricity application please be careful and do not...

Страница 36: ...Printed in the Czech Republic ACXF60 37631 AB ...

Отзывы: