Pump Down Procedure (Common to Cooling and Heating)
7. Con
¿
gure the forced close setting of the bypass valve.
Perform the procedure below to con
¿
gure the bypass valve forced close setting approximately 5 minutes after
performing the test run on the outdoor unit.
(1) Follow the procedure of 5-(1) to (2) to select
“
עװ
”. The display “
ؠ
” will appear.
(2) Press the SET (S007) key. “
” will be
displayed. The LEVEL LED (D053) will be
illuminated.
(3) Press the UP (S005) / DOWN (S006) key, and
select menu item “
؆ؠ
” (Figure 13).
(4) Press the SET (S007) key for 1 second or more. The TEST/WARNING LED (D052) will be illuminated
and the bypass valve will be set to fully closed.
Caution: This setting results in not just the bypass valve but also the liquid valve, outdoor fan, and the like performing
the operation required for the pump-down. Be sure to con
¿
gure this setting because a pump-down may not
be possible if this setting is omitted.
If it is performed during a test run, the engine will stop automatically after up to 15 minutes have elapsed
(to protect the equipment). Therefore, make sure the subsequent procedure is performed quickly after
con
¿
guring the setting.