Fig. M1
Note:
A. Do not rub vertically or apply excess pressure to the Video
Heads.
Do not turn the Upper Cylinder Unit clockwise while cleaning.
B. After cleaning, use a Dry Head Cleaning Stick (VFK27) to
remove any Ethanol remaining on the cylinder tape path.
Otherwise, tape damage will occur.
6.2.2. ADJUSTMENT PROCEDURES BACK TENSION CONFIRMATION
Purpose:
To fine adjust the Back Tension so that the tape runs smoothly
with a constant tension.
Symptom of Misadjustment:
1) If the tape tension is less than the specified value, the tape
cannot come into proper contact with the Video Heads, resulting
in poor picture playback.
2) If the tape tension is too high, the tape will soon be damaged.
Equipment Required:
Back Tension Meter (Made in U.S.A., Purchase Locally)
VHS Cassette Tape (120-Minute Tape)
Specification:
20 gf±2.5 gf
(0.196 N±0.025 N)
1. Play back a T120 cassette tape from the beginning for approx. 10
to 20 seconds to stabilize tape movement.
2. Insert a Tension Meter into tape path and measure the back
tension.
Содержание OmniVision PV-QV200
Страница 24: ...5 2 2 Inner Parts Location Fig J1 1 ...
Страница 25: ...5 2 3 EJECT Position Confirmation Fig J1 2 ...
Страница 26: ...5 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 ...
Страница 40: ...5 3 CASSETTE UP ASS Y SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 ...
Страница 86: ...10 2 MECHANISM BOTTOM SECTION ...
Страница 87: ...10 3 CASSETTE UP COMPARTMENT SECTION ...
Страница 88: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION ...
Страница 89: ...10 5 PACKING PARTS AND ACCESSORIES SECTION ...
Страница 117: ...R3036 ERJ6GEYJ122V MGF CHIP 1 10W 1 2K ...
Страница 123: ...ECKATS101MB CERAMIC 20 250V 100P ...
Страница 125: ...C3021 ECUV1C224ZFV C CHIP 80 20 16V 0 22 ...