Fig. D4
C. Install the Mechanism Chassis and Cassette Up Ass'y straight
onto the Main C.B.A. so that the Sensor LED clears the hole in
the Mechanism Chassis and that 5 Connectors (P6201, P6202,
P3551, P4001,and P4451 ( Model: E,F)) are aligned and seated
securely.
5. Installation of Cassette Up Ass'y
A. Confirm that the Locking Tab (L-6) under the Cassette Up Ass'y
is in Hole on the Mechanism Chassis when installing the
Cassette Up Ass'y. Then, slide the Cassette UpAss'y towards
the back.
B. When installing 2 Screws (S-9), slide the Holder Unit (Refer to "
METHOD FOR LOADING/UNLOADING OF MECHANISM
" in
SERVICE NOTES) to tighten screws.Then, slide it back to the
EJECTPosition.
C. Hook Spring (P-1) to the Drive Rack Arm on the Mechanism
Chassis.
5.2. MECHANISM SECTION
5.2.1. Disassembly/Reassembly Method
Содержание OmniVision PV-QV200
Страница 24: ...5 2 2 Inner Parts Location Fig J1 1 ...
Страница 25: ...5 2 3 EJECT Position Confirmation Fig J1 2 ...
Страница 26: ...5 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 ...
Страница 40: ...5 3 CASSETTE UP ASS Y SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 ...
Страница 86: ...10 2 MECHANISM BOTTOM SECTION ...
Страница 87: ...10 3 CASSETTE UP COMPARTMENT SECTION ...
Страница 88: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION ...
Страница 89: ...10 5 PACKING PARTS AND ACCESSORIES SECTION ...
Страница 117: ...R3036 ERJ6GEYJ122V MGF CHIP 1 10W 1 2K ...
Страница 123: ...ECKATS101MB CERAMIC 20 250V 100P ...
Страница 125: ...C3021 ECUV1C224ZFV C CHIP 80 20 16V 0 22 ...