5. Test Mode
1.Set the power switch to "off".
2.Press and hold both the "Water lever" and "Wash" buttons with one hand.
3.Press the power switch to "on".
4.Release your fingers from the buttons and power switch which you pressed in steps (2) and (3) .
(Check A can be carried out in this state with your fingers released)
5.Within three seconds press the "Water lever " button to set the desirer check procedure.
(Carry out checks B, C, E, M, G and H)
Check Contents
• When the end buzzer sounds three
• Cycle end buzzer
times, the lamps will simultaneously
0
A
• Timer indicator
flash on and off in the remaining
• Auto power off
time display, and the power will auto-
matically be switched off immediately
after operation is finished.
• Even if there is no water in the tub, the washing
• Washing
operation will continue for 6 minutes.
1
B
operation
• Press the "wash" button once FV-1 operates,
and press twice to operate FV-2.
• If the PCB fault occurred, an error indication
"H05" will display.
• The spinning operation will continue for 7 minutes.
• Spin operation
**Check the lid & SF switch operation
2
C
• Lid/SF switch
*While opening lid
1) "74L" lights up … Lid switch working
2) "86L" lights up … SF switch working
Operation condition
Check
Procedure
Lamp illumination condition
Number of timers
the "Water lever"
button is pressed
Check H
Check G
Check M
Check E
Check A
Check B
Check C
(2)
(3)
(1)
-6-
Содержание NA-FS14G2
Страница 16: ...8 Wiring Diagram 15 ...