2-6
Installation
2.2.1 Preparation
— Tools needed
• Screwdriver
• Drill
— Hardware
• Install the VPS on the wall (See page 2-9)
• Connect telephone lines between the VPS and PBX (See page 2-12)
• Connect a data terminal or a printer to the VPS (See page 2-15)
• Connect the power cable to the VPS (See page 2-18)
— Software
• Set the RS-232C parameters (See page 4-76)
• Startup System (See page 4-6)
• Quick Setup (See page 4-8)
— Power Supply
Check the Voltage Selector to confirm that it is set to your household AC volt-
age. If not, set the Voltage Selector on the back of the main unit to the correct
position with a screwdriver.
2.2
Installation
200V
VOLTAGE
ADJUST
Содержание KX-TVP100
Страница 332: ...W 3 2 Worksheets See page 6 10 Message Manager Top Menu 3 Message Manager s Password Message Manager s Password ...
Страница 335: ...Worksheets W 3 5 See pages 6 12 6 13 Message Manager Top Menu 5 2 Company Name Company Name ...
Страница 341: ...Printed in Japan PSQX1052ZA IW0595Y0 Matsushita Electric Industrial Co Ltd Central P O Box288 Osaka 530 91 Japan ...