31
KX-FT932BR-B
Phase A
: Call setting
Call setting can be manual/automatic.
Phase B
: Pre-message procedure
Phase B is a pre-processing procedure and sequence for confirming the status of the terminal, transmission route, etc., and for
terminal control. It implements terminal preparation status, determines and displays terminal constants, confirms synchroniza-
tion status, etc. and prepares for transmission of facsimile messages.
Phase C
: Message transmission
Phase C is the procedure for the transmitting facsimile messages.
Phase D
: Post message procedure
Phase D is the procedure for confirming that the message is completed and received. For continuous transmission, phase B or
phase C is repeated for transmission.
Phase E
: Call retrieval
Phase E is the procedure for call retrieval, that is for circuit disconnection.
4.
Concerning Transmission Time
Transmission Time = Control Time + Image Transmission Time + Hold Time
Transmission time consists of the following.
Control time:
This is time at the start of transmission when the functions at the sending and receiving sides are confirmed, the transmission
mode is established, and transmission and reception are synchronized.
Image transmission time:
This is the time required for the transmission of document contents (image data). In general, this time is recorded in the catalog,
etc.
Hold time:
This is the time required after the document contents have been sent to confirm that the document was actually sent, and to
check for telephone reservations and/or the existence of continuous transmission.
5.
Facsimile Standards
Item
Telephone Network Facsimile
G3 Machine
Connection Control Mode
Telephone Network Signal Mode
Terminal Control Mode
T. 30 Binary
Facsimile Signal Format
Digital
Modulation Mode
PSK (V. 27 ter) or QAM (V. 29)
Transmission Speed
300 bps (Control Signal)
2400, 4800, 7200, 9600 bps (FAX Signal)
Redundancy Compression
Process
(Coding Mode)
1 dimension: MH Mode
2 dimension: MR Mode (K=2.4)
Resolution
Main Scan: 8 pel/mm
Sub Scan: 3.85, 7.7l/mm
Line Synchronization Signal
EOL Signal
1 Line Transmission Time
[ms/line]
Depends on the degree of data reduction.
Minimum Value: 10, 20
Can be recognized in 40ms.
Содержание KX-FT932BR-B
Страница 11: ...11 KX FT932BR B 6 Technical Descriptions 6 1 Connection Diagram ...
Страница 21: ...21 KX FT932BR B 6 4 2 Block Diagram ...
Страница 23: ...23 KX FT932BR B ...
Страница 35: ...35 KX FT932BR B b Redundancy Compression Process Coding Mode This unit uses one dimensional MH format ...
Страница 60: ...60 KX FT932BR B 11 2 The Example of the Printed List 11 2 1 User Mode Example of a printed out list ...
Страница 61: ...61 KX FT932BR B 11 2 2 Service Mode Example of a printed out list ...
Страница 67: ...67 KX FT932BR B ...
Страница 68: ...68 KX FT932BR B CROSS REFERENCE Test Mode P 54 ...
Страница 69: ...69 KX FT932BR B CROSS REFERENCE Test Mode P 54 ...
Страница 70: ...70 KX FT932BR B CROSS REFERENCE Test Mode P 54 ...
Страница 71: ...71 KX FT932BR B ...
Страница 73: ...73 KX FT932BR B ...
Страница 74: ...74 KX FT932BR B ...
Страница 75: ...75 KX FT932BR B CROSS REFERENCE Test Mode P 54 ...
Страница 102: ...102 KX FT932BR B NG Wave pattern Note Refer to NG Example P 107 ...
Страница 104: ...104 KX FT932BR B I O and Pin No Diagram ...
Страница 106: ...106 KX FT932BR B ...
Страница 107: ...107 KX FT932BR B 12 5 5 3 NG Example ...
Страница 111: ...111 KX FT932BR B 12 5 7 2 Troubleshooting Flow Chart ...
Страница 115: ...115 KX FT932BR B 12 5 10 CIS Contact Image Sensor Section Refer to Scanning Block P 24 CROSS REFERENCE Test Mode P 54 ...
Страница 116: ...116 KX FT932BR B 12 5 11 Thermal Head Section Refer to Thermal Head P 22 ...
Страница 117: ...117 KX FT932BR B 13 Service Fixture Tools ...
Страница 120: ...120 KX FT932BR B 14 2 Disassembly Procedurel 14 2 1 How to Remove the Operation Panel Block ...
Страница 121: ...121 KX FT932BR B 14 2 2 How to Remove the Operation Board LCD and Platen Roller ...
Страница 122: ...122 KX FT932BR B 14 2 3 How to Remove the Separation Holder and Document Feed Support ...
Страница 123: ...123 KX FT932BR B 14 2 4 How to Remove the Image Sensor CIS and Feed Roller ...
Страница 124: ...124 KX FT932BR B 14 2 5 How to Remove the Lock Lever and Thermal Head ...
Страница 125: ...125 KX FT932BR B 14 2 6 How to Remove the Bottom Frame ...
Страница 126: ...126 KX FT932BR B 14 2 7 How to Remove the Analog Board Digital Board Power Supply Board and Power Cord ...
Страница 127: ...127 KX FT932BR B 14 2 8 How to Remove the Gear Block and Separation Roller 14 2 9 How to Remove the Motor of Gear Block ...
Страница 128: ...128 KX FT932BR B 14 2 10 Installation Position of the Lead Wires ...
Страница 134: ...134 KX FT932BR B 15 2 3 Mechanical Movements in the Main Operations 15 2 3 1 Idle Status ...
Страница 136: ...136 KX FT932BR B 15 2 3 4 Copying CROSS REFERENCE Sensor Section P 114 ...
Страница 140: ...140 KX FT932BR B 16 1 4 Power Supply Board ...
Страница 143: ...143 KX FT932BR B 16 3 Test Chart 16 3 1 ITU T No 1 Test Chart ...
Страница 144: ...144 KX FT932BR B 16 3 2 ITU T No 2 Test Chart ...
Страница 145: ...145 KX FT932BR B MEMO ...
Страница 152: ...152 KX FT932BR B MEMO ...
Страница 161: ...161 KX FT932BR B MEMO ...
Страница 163: ...163 KX FT932BR B 20 1 2 Upper Cabinet Section ...
Страница 164: ...164 KX FT932BR B 20 1 3 Lower Cabinet Section ...
Страница 165: ...165 KX FT932BR B 20 1 4 Gear Block Section ...
Страница 166: ...166 KX FT932BR B 20 1 5 Screws ...
Страница 167: ...167 KX FT932BR B 20 1 6 Accessories and Packing Materials ...