![Panasonic CS-E24DKE Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/panasonic/cs-e24dke/cs-e24dke_service-manual_256896040.webp)
3. Explanation of operation
1) At the deice starting signal, the compressor frequency is set to the value as previously mentioned.
2) At 120 sec. after deice starting signal generated, 4 way valve OFF and at the same time outdoor fan is OFF, indoor fan is OFF,
compressor frequency is set to the previously mentioned value.
3) WIthin 30 sec. after the 4 way valve OFF, the compressor frequency is set to the previously mentioned value.
4) If the outdoor heat exchanger temperature is above a°C, the compressor frequency is set to the value as previously mentioned.
5) After the compressor frequency is changed according to the item 4), in case either outdoor heat exchanger temperature more than b°C
or 10.5 minutes lapsed after 4 way valve OFF is fulfilled, 30 sec. calculation start.
6) After 5) operated, if the outdoor heat exchanger temperature is more than c°C or 30 sec. lapsed, deice operation completion signal
transmit, the compressor frequency is set to the previously mentioned value. And timingly ON signal transmit on outdoor FM.
7) After 59 sec. lapsed after deice operation completion signal generated, 4 way valve/indoor fan is ON, compressor frequency become
FREE, and recover to normal heating operation.
4. Deice operation judgement condition
When any of below a, b, c, d condition is satisfied, deice signal is produced.
a. Continuously, outdoor heat exchanger temperature < 3°C for 120 minutes and outdoor heat exchanger temperature
< -6°C for 3 minutes and outdoor air temperature > -1°C and Comp. is ON.
b. Continuously, outdoor heat exchanger temperature < 3°C for 80 minutes and outdoor heat exchanger temperature
< -7°C for 3 minutes and outdoor air temperature > -1°C and Comp. is ON.
c.
Continuously, outdoor heat exchanger temperature < 3°C for 40 minutes and outdoor heat exchanger temperature
< -9°C for 3 minutes and outdoor air temperature > -3°C and Comp. is ON.
d. Continuously, outdoor heat exchanger temperature < 3°C for 40 minutes and outdoor heat exchanger temperature
< -11°C for 3 minutes and outdoor air temperature > -3°C and Comp. is ON.
However, the first deice will start only after minimum of 60 minutes in operation.
(2nd deice and onward shall follow above conditions)
40
CS-E24DKE CU-E24DKE
Содержание CS-E24DKE
Страница 9: ...4 Dimensions 4 1 Indoor Unit Remote Control 9 CS E24DKE CU E24DKE ...
Страница 10: ...4 2 Outdoor Unit 10 CS E24DKE CU E24DKE ...
Страница 11: ...5 Refrigeration Cycle Diagram 11 CS E24DKE CU E24DKE ...
Страница 12: ...6 Block Diagram 12 CS E24DKE CU E24DKE ...
Страница 13: ...7 Wiring Diagram 13 CS E24DKE CU E24DKE ...
Страница 19: ...B Indoor Fan Control i Indoor fan control operation outline 1 Cooling Dry 2 Heating 19 CS E24DKE CU E24DKE ...
Страница 62: ...3 For the embedded piping This can be used for left rear piping left bottom piping also 62 CS E24DKE CU E24DKE ...
Страница 77: ...13 Technical Data 77 CS E24DKE CU E24DKE ...
Страница 89: ...89 CS E24DKE CU E24DKE ...
Страница 91: ...18 3 Remote Control 91 CS E24DKE CU E24DKE ...
Страница 92: ...18 4 Print Pattern Indoor Unit Printed Circuit Board 92 CS E24DKE CU E24DKE ...
Страница 93: ...18 5 Print Pattern Outdoor Unit Printed Circuit Board 93 CS E24DKE CU E24DKE PHAAM Printed in Malaysia ...
Страница 94: ......