3
ROBATA 72/54 CONCRETE FIRE | Installation & Owner’s Manual
BASIC ASSEMBLY
METAL COVER
(OPTIONAL)
PILOT ASSEMBLY
BURNER ASSEMBLY
FLEX CONNECTOR
PIPE ADAPTER
TOP
TOPPING TRAY
GAS / ELECTRICAL
SUPPLY
BODY
ROBATA 72
ROBATA 54
1. UNPACK: Account for all parts (p. 15-16)
2. FRAGILE: Handle with care
3. LEVEL: Place on a solid, level surface
4. AIR VENTS: Do not block ventilation gaps (p. 4-5)
5. GAS / ELECTRICAL: Supply lines are routed through the
base of the unit and must be installed by licensed trades
6. MEDIA TOPPINGS: Review correct placement (p. 7-8)