![Pacific energy FP25AR Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/pacific-energy/fp25ar/fp25ar_installation-and-operating-instructions-manual_3168608015.webp)
Chimney
Installation
Listed Chimney and Chimney Connector
This appliance must be installed with a 6"(150mm) chimney
system approved under the following standards: CAN-ULC S629(IN
CANADA) OR UL 103hT(IN U.S.).
yOU MUST FOLLOW ThE ChIMNEy MANUFACTURER'S
INSTALLATION INSTRUCTIONS FOR INSTALLATION OF
ALL ChIMNEy COMPONENTS.
MAINTAIN CLEARANCES TO COMBUSTIBLES AS
SPECIFIED IN ThE ChIMNEy MANUFACTURERS
INSTALLATION INSTRUCTIONS
USE APPROPRIATE SUPPORTS, CAPS, FLAShING
AND ShIELDS IN ACCORDANCE WITh ThE ChIMNEy
MANUFACTURERS INSTALLATION INSTRUCTIONS.
ThE FOLLOWING INSTRUCTIONS ARE GENERAL
GUIDELINES ONLy.
CAUTION: ThE STRUCTURAL INTEGRITy OF ThE FLOOR,
WALL AND CEILING/ROOF MUST BE MAINTAINED.
NOTE: FOR ALL CHIMNEYS, YOU MUST USE THE
MANUFACTURER'S FIREPLACE ANCHOR PLATE.
(If
using ICC chimney pipe and anchor plate, you will need
to install an Anchor Plate spacer. Part #FP30.7757)
NOTE: The FP25 must be installed so the outlet of the chimney
system is a minimum 15ft(4.6m) in height as measured from
the base of the unit up to a maximum height of 35'(10.7m).
The chimney must be supported on lengths over 20'(6.1m).
NOTE:
Longer chimney lengths and different pitch flashings
may be used. Install all components to the chimney
manufacturer's installation requirements. Consult your
chimney supplier for installation advice.
1. After locating the desired location and framing in the
fireplace, cut and frame square holes in all floors, ceilings,
and roof that the chimney will pass through. Use a plumb
bob to line up the holes. The chimney support is mounted
to the framing.
2. Maintain a minimum 2"(51mm) clearance between the
chimney and any combustible materials. Do not fill the
space with insulation or any other combustible material.
3. Install the pipe manufacturer's,
fireplace anchor plate
by inserting it into the flue collar on the fireplace. We
recommend sealing the joint with stove cement. Secure
the anchor plate with stainless steel screws.
4. Assemble the chimney sections so the finished length
is resting on the manufacturer's adapter and protruding
through the roof. Avoid having joints between the ceiling
and the roof. It is required that the chimney connections
be secured with three (3)-#8x½"(12 mm) metal screws.
5. Install the radiation shields, firestops and all pieces
necessary to prevent contact with combustible materials
whenever passing through floors, ceilings or attic spaces.
6. Install the roof support then assemble the flashing and
the storm collar. Be sure to maintain the vapour barrier
at this point. (Seal securely.)
7. Attach the rain cap and check the flashing for leaks.
8. If the chimney extends more than 5'(1.5m) above the
point of contact with the roof, then it must be secured
using roof braces.
Chase/Enclosure
WARNING: Combustible materials cannot be used in the
space directly above the fireplace. Do not fill the space
above the fireplace with any material. (except the wood
framing)
WARNING: The fireplace must not be in contact with any
insulation or loose filling material. Cover the insulation
with drywall panels around the fireplace. Maintain proper
clearances as per Fig. #7.
WARNING: Drywall materials are considered combustible
and theIr thickness must be accounted for in your framing
dimensions.
If the chimney runs up the outside of the residence, we
recommend it be enclosed in a chase structure. The chase
should be constructed in such a way that it is an extension of
the home. It should be well insulated between the footings and
the floor of the home to prevent heat loss. We also recommend
to insulate the ceiling of the chase just as if it were in the attic
space. This will prevent cold air from dropping down through
the chase and into the room where the fireplace is installed.
Some local codes require that the walls be insulated, vapor
sealed and sheathed with a fire rated gypsum board. We
strongly recommend this procedure for all installations to
prevent cold drafts from originating in the fireplace enclosure.
If you follow this procedure, do not insulate the wall directly
above the front of the fireplace.
NOTE: Check local codes concerning installation requirements
and restrictions in your area.
Mobile home Installation:
- In the USA: the unit must be installed in accoradance with
the requirements of the Department of Housing and Urban
Development(HUD)"Manufactured Home Construction
and Safety)
- In Canada: the unit must be installed with access openings
into the built in enclosure for inspection purposes that
must require a household tool to open.
15
5055.7618_210916-32
FP25.BODYA
Содержание FP25AR
Страница 28: ...28 5055 7618_210916 32 FP25 BODYA ...
Страница 29: ...29 5055 7618_210916 32 FP25 BODYA ...
Страница 30: ...30 5055 7618_210916 32 FP25 BODYA ...