Pacific energy B Series Скачать руководство пользователя страница 9

9

CORNER INSTALLATION

1) Determine the exact position of the gas stove, making sure the

unit will be set at 45° to the walls and the corner clearance will not
be less then 1-inch. The vent pipe should be centred (if possible)
between two building members. This will avoid any extra framing.

2) Once the desired location is found, carefully measure up 23-

inches from the finished floor and make a mark. Next, measure 7-
inches plus the actual corner clearance of the appliance over from
the corner of the room and make a mark. (i.e. corner clearance of
1", measure 8"; corner clearance of 3", measure 10")

IMPORTANT: When locating this hole it should be noted that the
bottom of the vent terminal must be a MINIMUM of 12-inches
above grade, the top of the terminal must be a MINIMUM of 24-
inches below combustible material such as a deck or roof
overhang and the side of the terminal must be a MINIMUM of 12-
inches away from an adjacent wall. (See Figure 13)

3) Cut a 9-inch square or round hole through the exterior wall of the

building.

4) Position the wall thimble spacer (WTS) from the inside through

the 9-inch hole. (Figure 9). For walls less than 11-inches thick, the
thimble must be trimmed back flush with the exterior wall.

5) Attach the trim collar to the flanges of the wall thimble with the

screws provided.

6) Attach the coaxial 45° elbow (LB 45) to the unit. Slide the 5-inch

inner elbow pipe 1-inch over top of the collar and secure with three
sheet metal screws. Seal the joint with high temperature silicone.
Next, slide the outer elbow pipe over the smaller elbow and secure
to the pipe collar with three sheetmetal screws.

7) The coaxial starter pipe (SK 18) may have to be cut to length

depending on the wall thickness and/or corner clearance of the
stove. Measure the wall thickness from the finished trim collar
surface to the exterior mounting surface for the vent terminal. Add
3 3/4-inches plus corner clearance to the wall thickness. (i.e.
corner clearance of 1", add 4 3/4" , corner clearance of 3", add 6
3/4" to wall thickness)

Fig. # 10

8) Cut both pipes to this length.

9) Slide the inner 5-inch flue pipe over top of the crimped end of

elbow and attach with three sheet metal screws. Seal the joint with
high temperature silicone. Next, slide the 7-inch outer elbow pipe
over the 5-inch elbow fully and secure to the elbow with three
sheet metal screws. Assure that the vent pipe is level.

10) Slide the appliance into place making sure vent pipe is centred in

wall pass-through. When the unit is properly installed, the 7-inch
vent pipe will project 3/4-inch past the outside wall surface and the
5-inch inner pipe will extend 1-inch past that.

11) Install vent terminal according to section 

VENT TERMINAL

INSTALLATION

Содержание B Series

Страница 1: ...try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions...

Страница 2: ...ALLATION PRECAUTIONS 7 MANUFACTURED MOBILE HOME 7 STRAIGHT THROUGH WALL 8 CORNER INSTALLATION 9 BASEMENT INSTALLATION 11 FLOOR PROTECTION 11 VENT TERMINAL INSTALLATION 12 LOG SET 13 LIGHTING INSTRUCTI...

Страница 3: ...requent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compart ments burners and circulating air passageways of the appliance be kept...

Страница 4: ...x 3 Fasten in place with the 8 x 1 2 sheet metal screws provided Two screws at the top and three at the bottom of the valve assembly Fig 2 Caution Before making wiring connections ensure all power is...

Страница 5: ...5 Connect Here Fig 4 Fig 3 Optional Wall Switch or Wall thermostat Optional Blower Wiring...

Страница 6: ...Z 80 watts Fig 5 For your protection against shock hazard use only a properly grounded outlet that will accept a three pronged plug Do not cut or remove the grounding prong Consult local codes or in t...

Страница 7: ...er lag screws Consult local codes for approval INSTALLATION PRECAUTIONS The Mirage Gas Appliance installation and venting must con form to the current CAN CGA B149 installation code in Canada or the c...

Страница 8: ...arter pipe SK 18 may have to be cut to length depending on the wall thickness and or rear clearance of the stove Measure the wall thickness from the finished trim collar surface to the exterior mounti...

Страница 9: ...f the wall thimble with the screws provided 6 Attach the coaxial 45 elbow LB 45 to the unit Slide the 5 inch inner elbow pipe 1 inch over top of the collar and secure with three sheet metal screws Sea...

Страница 10: ...10 Fig 11...

Страница 11: ...components per the pre planned system configuration Support spacer must be used for each 6 feet of vertical and horizontal run The spacers are placed around the pipe and nailed or screwed to the fram...

Страница 12: ...nt pipe Attach backing plate to the outside wall with screws at each corner Fasten the vent pipe in place with sheet metal screws through the holes provided in the collar 2 Attach vent terminal box to...

Страница 13: ...t side facing rear and bark side forward 2 Place the front log on the tabs located at the front of the burner The log is notched to fit over top of the pilot 3 The top Y log bridges across from the fr...

Страница 14: ...ions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL...

Страница 15: ...ly depress and turn gas control knob clockwise past PILOT to OFF position DO NOT FORCE NOTE The SIT control has an interlock device which does not allow the pilot to be lit when the appliance is at op...

Страница 16: ...MFSD 1583_ _ 9 FRONT TRIM 2 pc required 1548 03 10 GLASS FRAME MFSD 1518 11 GLASS PANEL 2073 12 BURNER ASSEMBLY MFSD 1510 13 FLAME SHIELD MFSD 1564 14a PEDESTAL SIDE RIGHT 1545 5 14b PEDESTAL SIDE LE...

Страница 17: ...17 Fig 20...

Страница 18: ...18 NOTES...

Страница 19: ...local se conformer la norme CAN CGA B149 en vigueur MANUFACTURED MOBILE HOME FABRIQUEZ MOBILE MAISON May be installed in Manufactured Homes after the first sale See Instructions Pouvez tre install s d...

Страница 20: ...20 Pacific Energy Fireplace Products Ltd Box 1060 Duncan B C V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: