Pacific energy B Series Скачать руководство пользователя страница 11

11

Fig. # 12

HORIZONTAL AND VERTICAL

VENT COMBINATION

(TWO 90° ELBOWS MUST BE USED)

BASEMENT INSTALLATION

1) In planning a basement installation it is necessary to determine

the exact position of the gas stove, the location of the vent
terminal and the length of vent pipe to be used. Various combina-
tions of vertical and horizontal vent pipe may be employed.
Always plan your installation to minimize extra framing. The
breeching through the exterior wall should be centred (if possible)
between two building members.

IMPORTANT: When locating this hole it should be noted that the
bottom of the vent terminal must be a MINIMUM of 12-inches
above grade, the top of the terminal must be a MINIMUM of 24-
inches below combustible material such as a deck or roof
overhang and the side of the terminal must be a MINIMUM of 12-
inches away from an adjacent wall. (See Figure 13)

2) Attach the coaxial vent pipe or 90° elbow with crimped end away

from unit. All joints and seams in the vent system should be
sealed with high temperature silicone.

3) Continue adding vent components per the pre-planned system

configuration. Support spacer must be used for each 6-feet of
vertical and horizontal run. The spacers are placed around the
pipe and nailed or screwed to the framing members. Maintain a
minimum 1-inch clearance to combustibles.

4) The starter pipe (SK 18 or SK 24) must be the last section  in the

vent
system.  The pipe may have to be cut to length depending on the
wall thickness and/or position of vent system. Cut both pipes to
the same length. Do not cut off the crimp-bead off the 5-inch inner
pipe.

5) When the unit and venting is properly installed, the 7-inch vent

pipe will project 3/4-inch past the outside wall surface and the 5-
inch inner pipe will extend 1-inch past that.

6) Install vent terminal according to section 

VENT TERMINAL

INSTALLATION

WARNING:  MAKE CERTAIN THAT THE ELBOW ASSEMBLY OR
STRAIGHT PIPE SECTION IS PUSHED ALL THE WAY ONTO THE
STARTING COLLARS AND IS SECURELY FASTENED.

FLOOR PROTECTION

The Mirage direct vent appliance may be installed on a combustible
floor. If the appliance is to be installed directly on carpeting, tile or
other combustible material other than wood flooring, the appliance
shall be installed on a metal or wood panel extending the full width and
depth of the unit.

Содержание B Series

Страница 1: ...try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions...

Страница 2: ...ALLATION PRECAUTIONS 7 MANUFACTURED MOBILE HOME 7 STRAIGHT THROUGH WALL 8 CORNER INSTALLATION 9 BASEMENT INSTALLATION 11 FLOOR PROTECTION 11 VENT TERMINAL INSTALLATION 12 LOG SET 13 LIGHTING INSTRUCTI...

Страница 3: ...requent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compart ments burners and circulating air passageways of the appliance be kept...

Страница 4: ...x 3 Fasten in place with the 8 x 1 2 sheet metal screws provided Two screws at the top and three at the bottom of the valve assembly Fig 2 Caution Before making wiring connections ensure all power is...

Страница 5: ...5 Connect Here Fig 4 Fig 3 Optional Wall Switch or Wall thermostat Optional Blower Wiring...

Страница 6: ...Z 80 watts Fig 5 For your protection against shock hazard use only a properly grounded outlet that will accept a three pronged plug Do not cut or remove the grounding prong Consult local codes or in t...

Страница 7: ...er lag screws Consult local codes for approval INSTALLATION PRECAUTIONS The Mirage Gas Appliance installation and venting must con form to the current CAN CGA B149 installation code in Canada or the c...

Страница 8: ...arter pipe SK 18 may have to be cut to length depending on the wall thickness and or rear clearance of the stove Measure the wall thickness from the finished trim collar surface to the exterior mounti...

Страница 9: ...f the wall thimble with the screws provided 6 Attach the coaxial 45 elbow LB 45 to the unit Slide the 5 inch inner elbow pipe 1 inch over top of the collar and secure with three sheet metal screws Sea...

Страница 10: ...10 Fig 11...

Страница 11: ...components per the pre planned system configuration Support spacer must be used for each 6 feet of vertical and horizontal run The spacers are placed around the pipe and nailed or screwed to the fram...

Страница 12: ...nt pipe Attach backing plate to the outside wall with screws at each corner Fasten the vent pipe in place with sheet metal screws through the holes provided in the collar 2 Attach vent terminal box to...

Страница 13: ...t side facing rear and bark side forward 2 Place the front log on the tabs located at the front of the burner The log is notched to fit over top of the pilot 3 The top Y log bridges across from the fr...

Страница 14: ...ions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL...

Страница 15: ...ly depress and turn gas control knob clockwise past PILOT to OFF position DO NOT FORCE NOTE The SIT control has an interlock device which does not allow the pilot to be lit when the appliance is at op...

Страница 16: ...MFSD 1583_ _ 9 FRONT TRIM 2 pc required 1548 03 10 GLASS FRAME MFSD 1518 11 GLASS PANEL 2073 12 BURNER ASSEMBLY MFSD 1510 13 FLAME SHIELD MFSD 1564 14a PEDESTAL SIDE RIGHT 1545 5 14b PEDESTAL SIDE LE...

Страница 17: ...17 Fig 20...

Страница 18: ...18 NOTES...

Страница 19: ...local se conformer la norme CAN CGA B149 en vigueur MANUFACTURED MOBILE HOME FABRIQUEZ MOBILE MAISON May be installed in Manufactured Homes after the first sale See Instructions Pouvez tre install s d...

Страница 20: ...20 Pacific Energy Fireplace Products Ltd Box 1060 Duncan B C V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: