background image

15

FIRST FIRE

When lit for the first time, the appliance will emit a slight odour for a
couple of hours.  This is due to the curing of paints, sealants and
lubricants used in the manufacturing process.  This condition is
temporary. Open doors and windows to ventilate area.  Smoke and
fumes caused by the curing process may cause discomfort to some
individuals.

OPERATING

The Mirage DV comes equipped with a millivolt combination gas
valve.  An optional wall thermostat may be installed to operate the
burner automatically.  Once a pilot light has been established, and the
gas valve knob turned to the "ON" position, the unit may be operated
one of two ways:

Manual HI-LO Flame Adjustment:

1) The HI-LO burner control knob can be rotated in both directions,

providing infinite control of gas flow rate to the burner and
therefore greater comfort control.  The HI setting provides a
maximum gas input, and rotating the knob clockwise toward the
LO setting will reduce the gas input to a minimum setting.

Wall Thermostat (optional):

2) Set the wall thermostat to a comfortable temperature.  Turn the

HI-LO burner control knob to a desired setting.  As heat is
required, the Mirage DV will turn on or off automatically.

Extend Shutdown:

1) To shutdown the appliance including the pilot, partially depress

and turn gas control knob clockwise past “PILOT” to “OFF”
position.  DO NOT FORCE.

NOTE:  The SIT control has an interlock device which does not allow
the pilot to be lit when the appliance is at operating temperature.  Let
the appliance cool down (approx. 60 sec.) before attempting to relight
the pilot.  DO NOT use force to rotate the control knob.

OPTIONAL BLOWER OPERATION

The circulating air blower is thermostatically controlled and will not
operate if appliance is cold. A few minutes after the appliance is lit and
the variable speed control set at a desired setting, the blower will
automatically turn on.  The blower will automatically turn off a few
minutes after the appliance is shut down.

Fig. # 18

FLAME ADJUSTMENT

The air shutter on the burner venturi tube controls the primary
combustion air to the gas burner. Some adjustment may be neces-
sary to obtain desired flame and to eliminate carbon deposits.  (See
Fig. # 17 for proper flame pattern)

Caution: Firebox side may be hot!

To Adjust: 

 (See Fig. # 18)

1) Loosen side panel retaining screws and open right side panel to

expose controls

2) Move air shutter adjustment rod in or out until proper flame is

achieved.

3) Close control side panel and tighten screws.

Caution:  Proper air shutter setting is a must.

The flame should be just orange and “lazy”.  It should NEVER be set
to create sooting on internal parts and glass.  Open air shutter
gradually until sooting stops.

Fig. # 17

BURNER

CONTROL

Manual HI-LO Control Knob

Fig. # 16

Содержание B Series

Страница 1: ...try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions...

Страница 2: ...ALLATION PRECAUTIONS 7 MANUFACTURED MOBILE HOME 7 STRAIGHT THROUGH WALL 8 CORNER INSTALLATION 9 BASEMENT INSTALLATION 11 FLOOR PROTECTION 11 VENT TERMINAL INSTALLATION 12 LOG SET 13 LIGHTING INSTRUCTI...

Страница 3: ...requent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compart ments burners and circulating air passageways of the appliance be kept...

Страница 4: ...x 3 Fasten in place with the 8 x 1 2 sheet metal screws provided Two screws at the top and three at the bottom of the valve assembly Fig 2 Caution Before making wiring connections ensure all power is...

Страница 5: ...5 Connect Here Fig 4 Fig 3 Optional Wall Switch or Wall thermostat Optional Blower Wiring...

Страница 6: ...Z 80 watts Fig 5 For your protection against shock hazard use only a properly grounded outlet that will accept a three pronged plug Do not cut or remove the grounding prong Consult local codes or in t...

Страница 7: ...er lag screws Consult local codes for approval INSTALLATION PRECAUTIONS The Mirage Gas Appliance installation and venting must con form to the current CAN CGA B149 installation code in Canada or the c...

Страница 8: ...arter pipe SK 18 may have to be cut to length depending on the wall thickness and or rear clearance of the stove Measure the wall thickness from the finished trim collar surface to the exterior mounti...

Страница 9: ...f the wall thimble with the screws provided 6 Attach the coaxial 45 elbow LB 45 to the unit Slide the 5 inch inner elbow pipe 1 inch over top of the collar and secure with three sheet metal screws Sea...

Страница 10: ...10 Fig 11...

Страница 11: ...components per the pre planned system configuration Support spacer must be used for each 6 feet of vertical and horizontal run The spacers are placed around the pipe and nailed or screwed to the fram...

Страница 12: ...nt pipe Attach backing plate to the outside wall with screws at each corner Fasten the vent pipe in place with sheet metal screws through the holes provided in the collar 2 Attach vent terminal box to...

Страница 13: ...t side facing rear and bark side forward 2 Place the front log on the tabs located at the front of the burner The log is notched to fit over top of the pilot 3 The top Y log bridges across from the fr...

Страница 14: ...ions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL...

Страница 15: ...ly depress and turn gas control knob clockwise past PILOT to OFF position DO NOT FORCE NOTE The SIT control has an interlock device which does not allow the pilot to be lit when the appliance is at op...

Страница 16: ...MFSD 1583_ _ 9 FRONT TRIM 2 pc required 1548 03 10 GLASS FRAME MFSD 1518 11 GLASS PANEL 2073 12 BURNER ASSEMBLY MFSD 1510 13 FLAME SHIELD MFSD 1564 14a PEDESTAL SIDE RIGHT 1545 5 14b PEDESTAL SIDE LE...

Страница 17: ...17 Fig 20...

Страница 18: ...18 NOTES...

Страница 19: ...local se conformer la norme CAN CGA B149 en vigueur MANUFACTURED MOBILE HOME FABRIQUEZ MOBILE MAISON May be installed in Manufactured Homes after the first sale See Instructions Pouvez tre install s d...

Страница 20: ...20 Pacific Energy Fireplace Products Ltd Box 1060 Duncan B C V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: