Pacific energy B Series Скачать руководство пользователя страница 8

8

Fig. # 8

STRAIGHT THROUGH WALL

1) Determine the exact position of the gas stove so that the direct

vent pipe is centred (if possible) between two building framing
members. This will avoid any extra framing.

2) Carefully measure up 23-inches from the finished floor and mark

the centre of a 9-inch square or round hole. (See Figure # 9)

IMPORTANT: When locating this hole it should be noted that the
bottom of the vent terminal must be a MINIMUM of 12-inches
above grade, the top of the terminal must be a MINIMUM of 24-
inches below combustible material such as a deck or roof
overhang and the side of the terminal must be a MINIMUM of 12-
inches away from an adjacent wall. (See Figure 13)

3) Cut a 9-inch square or round hole through the exterior wall of the

building.

4) Position the wall thimble spacer (WTS) from the inside through

the 9-inch hole. (Figure 13).  For walls less than 11-inches thick,
the thimble must be trimmed back flush with the exterior wall.

5) Attach the trim collar to the flanges of the wall thimble with the

screws provided.

6) The coaxial starter pipe (SK 18) may have to be cut to length

depending on the wall thickness and/or rear clearance of the
stove. Measure the wall thickness from the finished trim collar
surface to the exterior mounting surface for the vent terminal.  Add
1/4 inch plus rear clearance to the wall thickness (i.e. rear
clearance of 1", add 1 1/4" , rear clearance of 3", add 3 1/4" to wall
thickness).

7) Cut both pipes to this length. Do not cut off the crimp-bead off the

5-inch inner pipe.

8) The vent pipe must be attached to the collars of the gas stove with

the bead end towards the appliance. Slide the inner 5-inch flue

pipe over top of the collar up to the crimp-bead and attach with
three sheet metal screws. Seal the joint with high temperature
silicone. Next, slide the 7-inch outer pipe over the 5-inch pipe fully
and secure to the pipe collar with three sheet metal screws.
Assure that the vent pipe is level.

9) Slide the appliance into place, with vent pipe centred in wall pass-

through. When the unit is properly installed, the 7-inch vent pipe
will project 3/4-inch past the outside wall surface and the 5-inch
inner pipe will extend 1-inch past that. The coaxial vent pipe must
be level.

10) Install vent terminal according to section 

VENT TERMINAL

INSTALLATION

Fig. # 9

Содержание B Series

Страница 1: ...try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions...

Страница 2: ...ALLATION PRECAUTIONS 7 MANUFACTURED MOBILE HOME 7 STRAIGHT THROUGH WALL 8 CORNER INSTALLATION 9 BASEMENT INSTALLATION 11 FLOOR PROTECTION 11 VENT TERMINAL INSTALLATION 12 LOG SET 13 LIGHTING INSTRUCTI...

Страница 3: ...requent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compart ments burners and circulating air passageways of the appliance be kept...

Страница 4: ...x 3 Fasten in place with the 8 x 1 2 sheet metal screws provided Two screws at the top and three at the bottom of the valve assembly Fig 2 Caution Before making wiring connections ensure all power is...

Страница 5: ...5 Connect Here Fig 4 Fig 3 Optional Wall Switch or Wall thermostat Optional Blower Wiring...

Страница 6: ...Z 80 watts Fig 5 For your protection against shock hazard use only a properly grounded outlet that will accept a three pronged plug Do not cut or remove the grounding prong Consult local codes or in t...

Страница 7: ...er lag screws Consult local codes for approval INSTALLATION PRECAUTIONS The Mirage Gas Appliance installation and venting must con form to the current CAN CGA B149 installation code in Canada or the c...

Страница 8: ...arter pipe SK 18 may have to be cut to length depending on the wall thickness and or rear clearance of the stove Measure the wall thickness from the finished trim collar surface to the exterior mounti...

Страница 9: ...f the wall thimble with the screws provided 6 Attach the coaxial 45 elbow LB 45 to the unit Slide the 5 inch inner elbow pipe 1 inch over top of the collar and secure with three sheet metal screws Sea...

Страница 10: ...10 Fig 11...

Страница 11: ...components per the pre planned system configuration Support spacer must be used for each 6 feet of vertical and horizontal run The spacers are placed around the pipe and nailed or screwed to the fram...

Страница 12: ...nt pipe Attach backing plate to the outside wall with screws at each corner Fasten the vent pipe in place with sheet metal screws through the holes provided in the collar 2 Attach vent terminal box to...

Страница 13: ...t side facing rear and bark side forward 2 Place the front log on the tabs located at the front of the burner The log is notched to fit over top of the pilot 3 The top Y log bridges across from the fr...

Страница 14: ...ions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL...

Страница 15: ...ly depress and turn gas control knob clockwise past PILOT to OFF position DO NOT FORCE NOTE The SIT control has an interlock device which does not allow the pilot to be lit when the appliance is at op...

Страница 16: ...MFSD 1583_ _ 9 FRONT TRIM 2 pc required 1548 03 10 GLASS FRAME MFSD 1518 11 GLASS PANEL 2073 12 BURNER ASSEMBLY MFSD 1510 13 FLAME SHIELD MFSD 1564 14a PEDESTAL SIDE RIGHT 1545 5 14b PEDESTAL SIDE LE...

Страница 17: ...17 Fig 20...

Страница 18: ...18 NOTES...

Страница 19: ...local se conformer la norme CAN CGA B149 en vigueur MANUFACTURED MOBILE HOME FABRIQUEZ MOBILE MAISON May be installed in Manufactured Homes after the first sale See Instructions Pouvez tre install s d...

Страница 20: ...20 Pacific Energy Fireplace Products Ltd Box 1060 Duncan B C V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: