![Pace TF 1500 BGA Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/pace/tf-1500-bga/tf-1500-bga_operation-and-maintenance-manual_3142878027.webp)
System Operations Manual
www.paceworldwide.com
Page 27 of 40
10. Heater
Replacement
It is recommended you return the machine to PACE, Inc. or call a PACE representative to replace
the heater element.
CAUTION: REMOVE POWER CORD FROM MACHINE.
1. Remove the nozzle and vacuum pick.
2. Remove the 4 screws on each rail cover on the left and right sides
of the heater.
3. Remove the heater cover screws, 2 on each side.
Important Note:
Make sure to reinstall the black retaining blocks after
the removal of the rail covers on the reflow head
assembly. Failure to perform this operation may result
in loss of the ball bearings that are contained within the
rails.
This shows the right rail cover removed.
Black Retaining Blocks