![Pace TF 1500 BGA Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/pace/tf-1500-bga/tf-1500-bga_operation-and-maintenance-manual_3142878016.webp)
System Operations Manual
www.paceworldwide.com
Page 16 of 40
j.
Prism Calibration – This step is required to ensure the prism is properly aligned
so when the software shows the PCB and component visually aligned, they are
actually physically aligned.
i. Select setup screen. (Figure 8)
Figure 8
ii. Select prism calibration.
iii. Monitor now shows calibration screen. (Figure 9)
Figure 9
iv. Place alignment board with BGA in place in mounting brackets.
Prism Calibration