©2022 PACE Inc., Vass, North Carolina, All Rights Reserved Page 5
Initial Set-Up
Set up the MBT360 system by doing the following.
1. Remove the unit from its shipping container. Store the shipping container(s) in a convenient location.
Reuse of these containers will prevent damage if you ship or store the system.
2. Place the unit on a convenient workbench.
3. Ensure the POWER Switch (located on power source front panel) is in the "OFF" or "0"
position.
4. Inspect all system components, check for shipping damage, and ensure that all purchased components
(standard and optional) are present.
5. Assemble Tip & Tool Stands. Attach to the power source if desired using included hardware. Assembly
instructions are enclosed with each Tip & Tool Stand.
Attaching Tip & Tool Stand to MBT360
Attach the stand to the side of the MBT360’s chassis, using the following procedure. Refer to illustration.
1. Insert the two enclosed hex head Mounting Screws into the slot on the side of the chassis. Some kits may
contain four mounting screws: two with small heads and two with large heads. Use the screws that fit
properly in the slot. Also, some chassis may have more than one slot; use the lower slot.
2. Position the Mounting Screws to the rear of the chassis and
spaced approximately two inches apart. Refer to illustration.
3. Place the Tip & Tool Stand beside the chassis. Insert ends of
the two Mounting Screws into the two adjacent Tip & Tool
Stand mounting holes.
4. Install a Thumb Nut onto the end of each Mounting Screw.
Tighten Thumb Nuts to secure the Tip & Tool Stand in
position. You may wish to set the Power Source on its side
and remove the drip tray to ease installation of the Thumb
Nut.
5. Additional Tip & Tool Stands, or “cubbies”, may be secured to
each other by aligning mounting holes on stand sides. Use
provided hex head screws and thumb nuts to mount cubbies
together.
Instant SetBack Tool Stand Connection
If your system includes an Instant SetBack Tool Stand (ISB cubby), follow the steps below.
1. Connect the cable from the ISB cubby to the appropriate
receptacle on the rear panel of the power supply, being mindful
of which channel each belongs to.
2. Position the tool stand on workbench within operator reach.
3. Insert tool loaded with Tip-Heater Cartridges into the tool stand.
4. When the handpiece is placed into the ISB cubby, Temperature
Setback Mode will activate after 30 seconds. Lifting the
handpiece from the stand will resume normal operation.