9
OPERATION
•
Make sure the Economy switch is in the same
position on both generators.
•
All electronic devices should be turned OFF and
disconnected from generator
“O
O
F
F
F
F
O
”FF
•
Start generator engines. Make sure the green output
indicator light comes on for each generator.
•
When engines have stabilized, plug in icdevice to
AC receptacle and turn on first load.
•
Allow generator output to stabilize (engine and
attached devices run evenly) before plugging inthe
next load.
Maximum Power in Parallel Operation:
8.0kVA
Rated Power in Parallel Operation:
7.0kVA
Limit operation time to 3 seconds for load requiring
maximum output. For continuous operation, do
exceed the rated output.
Note:
It is strongly recommended to plug in devices
with the largest output first and the smallest output last to
help prevent overloading the generator.
POWERCORD
Using Extension Cords
P1PE assumes no responsibility for the content within this table. The use of this table is the responsibility of the user
only. This table is intended for reference only. The results produced by using this table are not guaranteed to be
correct or applicable in all situations as the type and construction of cords are highly variable. Always check with local
regulations and a licensed electrician prior to installing or connecting an electrical appliance
INVERTER PARALLELING OPERATION
INVERTER PARALLELING OPERATION
It is possible to connect two generators to each
other, using a parallel cable kit, to increase
available power output.
•
Connect Cables to two P4000iSE generators
according to the instructions provided with the cable
kit.
DANGER
Never connect the paralleling cord to
the inverters with the inverters
running. The inverters must not be
running and both the paralleling cord
switches must be off when connecting
the cords.
WARNING
Do not attempt to parallel the inverter
with any other manufacturers’
inverters. Do not use the paralleling
cord for any application other than
inverter paralleling. Do not use this
cord on other manufacturers’
inverters.
Always ensure that both ends of
the paralleling cord are switched off
before connecting the inverters.
Содержание P4000i
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...P1PE Position One Power Equipment Isaac Way Pembroke Dock Pembrokeshire SA72 4RW www p1pe co uk...