background image

Instruction Manual 

Updated11/2013

21 

| 24

• 

loss of carD: 

Anyone finding a lost card thus has authorization to use 

it at the corresponding charging pillar. So please advise your customers 
to be prudent. In the event of loss, your customer will require a new card. 
Lost cards, however, cannot be blocked on the HTML page.

• 

error: invaliD configuration:  

In this case please log into the 

HTML page as Administrator and configure your EWS Box under menu 
item "Installations", according to your required parameters. Under menu 
item "Maximum current (A)" enter the applicable Current Value for your 
system and save this to the settings.

• 

error: ventilation not supporteD:  

Here the ventilation system 

you use is not supported by the EWS Box. In such case, please change the 
ventilation system. It could, however, be the case that the respective ven-
tilation system is not yet activated in the settings on the HTML page. Log 
in to the HTML page as Administrator and change the setting "System pa-
rameter - Ventilation" under menu item "Installations". Otherwise check 
connection of the ventilator contactor in the contactor terminal X102.

• 

error: locking/unlocking mechanism: 

In this case, please check 

the connection to the socket actuator. The plug may have been incor-
rectly inserted in the bushing/port or the connection of the locking de-
vice to the EWS Box pins may not be correct. In this case, please contact 
your service partner.

• 

error: activate contactor: 

Here there is a faulty contact in the 

EWS Box in the contactor terminal X102 at contactor EV 1 or contactor 
EV 2. It may be necessary to disconnect and reconnect these. It might 
also be possible that the charging contactor feedback signal to the X401 
connection for EV 1 and X402 for EV 2 are failing due to an incorrect con-
nection / contact at the Pins 15.

• 

error: charging interrupteD (meter):  

This error is displayed if, 

for example, the S0+ or S0 output of the meter has no or an incorrect 
contact. Please check your plug connection at the meter and also at 
Pins 4 or 10 at connections X401 / X402. Otherwise, please contact your 
service partner.

• 

charging connection rcD / outage rcD sWitch:  

Remove plug 

from the charging socket and re-insert the RCD. Plug the cable back into 
the socket.

• 

error: current value cable / interrupteD charging cable: 

 

Either a cable which is incompatible with this charging station has been 
used with an incorrect resistance code or the cable is defect. Replace the 
charging cable with a correct / functioning cable.

• 

in the event of other errors:

 In each case, please restart the Wall-

box by switching off all RCCBs and the main switch and on again after 
approx. 30 seconds.

Please reference the exact positions at the EWS Box in the EWS-Box 
Quick guide to operations / HTML configuration  which is available for 
download from the Schletter GmbH website; see corresponding link in 

„10. Links for support“

.

Содержание Wallbox Duo

Страница 1: ...Compact design for wall mounting for various areas of operation Instruction Manual Updated11 2013 Image P CHARGE Wallbox Duo RFID Image P CHARGE Wallbox Duo push buttons Please keep these instructions...

Страница 2: ...elements 8 4 3 Electrical components 9 4 4 Socket equipment 9 4 5 Communication via EWS Box 10 4 6 Technical data independent of variant 10 4 7 Technical data independent of equipment 11 5 Installatio...

Страница 3: ...l Updated11 2013 3 24 8 General information 20 8 1 Rating plate 20 8 2 Service notes 20 8 3 Trouble shooting 20 9 Conformity 22 9 1 Associated guidelines and standards 22 10 Links for support 23 11 Se...

Страница 4: ...er additional functionality Working in conjunction with the SmartPvCharge or another embedded system the electric vehicle can be charged using surplus PV energy only if so required Systems such as cha...

Страница 5: ...ecognize potential hazards 2 3 Person instructed in electrics The operation of the P CHARGE Wallbox Duo must be driven by a person who is fully conversant with the electrics of the system and in full...

Страница 6: ...taller Warning Danger of suffocation asphyxiation Charging gassing batteries in an interior space can lead to asphyxiation According to the IEC 61851 1 the customer installed exhaust ventilation syste...

Страница 7: ...on must be observed 3 Scope of delivery Please first check the physical condition of your delivered product and en sure that it is complete Please do not throw the package as this may result in damage...

Страница 8: ...use of economi cal night time energy or time apportioned prioritized fleet management This functionality is only available if the Wallbox is connected to a server Left charging socket RFID card reader...

Страница 9: ...er phase 100 Imp kWh Pulsation according to output kWh Consumption is displayed in kWh units L1 L2 L3 With P U I or error message the relative phase is displayed Error With missing phases or incorrect...

Страница 10: ...request Dimensions Weight W H D approx 700 x 335 x 170 mm Weight variant specific approx 17 kg Installation and assembly Wall mounting Recommended installation height 1300 mm above top ground surface...

Страница 11: ...60 hPa 4 7 technical Data inDepenDent of eQuipment variant e car basic e car mixed e car premium variant e car basic e car mixed e car premium item no 261010 000 261010 300 261010 400 item no 261010 0...

Страница 12: ...t in damage to cabling particularly to cable strings leading to the charging sockets 5 4 Preparing the Wallbox Duo Open the front cover to the Wallbox by turning the key in the lock located on the und...

Страница 13: ...ful dust amount protection against splashing water from any direction is safeguarded following mounting and installation of the cable entry glands i e appropriate cable entries must be used Cable glan...

Страница 14: ...10 0mm Ensure that the holes are drilled to a sufficient depth to receive the wall plugs dowels 3 Fit each of the 6 M8x100 wafer head screws with a sealing rubber washer Position the cable bushing op...

Страница 15: ...ar panel 2 Next push the housing from the front up and over the rear panel Position the housing carefully to ensure that the slots fit around the respective cable bushings of the electrical components...

Страница 16: ...puter laptop via Ethernet and the EWS Box has to be configured properly For more detailed information on these EWS Box configuration settings please refer to the Links for support stated in Chapter 10...

Страница 17: ...lash Press the green flashing button to start the charging process The button is backlit in green throughout the entire charging process terminate charging process step 1 To end a charging session hol...

Страница 18: ...tions under Chapter 4 Installation System parameters Start charging process Step 1 To start a charging session plug the cable for the electric vehicle into the ap propriate charging socket Step 2 The...

Страница 19: ...icle into the ap propriate charging socket Step 2 The Optimized Charging process is selected by pressing Button 2 or 5 respectively Depending on the parameters chosen for server connection the chargin...

Страница 20: ...t intervals Type of function ality audit Inspector Electrical plants and fixed electrical installations in special installations or locations DIN VDE 0100 Group 700 1 year for an orderly condition Qua...

Страница 21: ...EWS Box pins may not be correct In this case please contact your service partner Error Activate contactor Here there is a faulty contact in the EWS Box in the contactor terminal X102 at contactor EV 1...

Страница 22: ...mmunity test IEC 61000 4 2 2009 and or EN 61000 4 2 Testing and measurement techniques Electrostatic discharge immunity test IEC 61000 2 2 2002 and or EN 61000 2 2 Environment Compatibility levels for...

Страница 23: ...tructions_V1_I800025GB pdf EWS Box Quick guide to operations HTML configuration www schletter de EN download traffic engineering ews box html P CHARGE_EWS Box_ _Administration_V1_I800024GB pdf EWS Box...

Страница 24: ...In the event of a warranty claim the company Schletter GmbH shall bear the costs required for transport travel labour and materials only excluded are the additional and potentially substantial costs i...

Отзывы: