20
The product group is either mounted onto the wall
or is connected to a distributor or hydronic header.
Wall attachment
1. Remove the front insulation shell (1).
2. Pull off the insertion block (2).
3.
Remove the product group (3) from the rear
insulation shell (4).
4. Place the rear insulation shell (4) perpendicularly
onto the wall to use it as drilling jig (illustr. 7).
5.
Mark and drill two holes. Insert the supplied
dowels.
6. Insert the spacer (5, supplied with the station)
into the lower bore of the rear insulation shell (4)
(illustr. 8).
7.
Mount the product group (3) into the rear
insulation shell (4).
8. Fix the station (product group with rear insulation
shell) onto the wall using the supplied hexagon
head screws (12 mm). At the top, the station is
fi xed with the integrated wall bracket (3a) and at
the bottom with the spacer (5) inserted into the
rear insulation shell.
9. Mount the insertion block (2).
u
The station is ready for the connection to the
pipework and further connection work.
Illustr. 9
Illustr. 10
3
5
4
3a
6.1 Wall attachment
Illustr. 8
5
1
3
4
2