Jiangsu Ouring 3D Technology co.,Ltd
16
6. Align the four positioning pins on the Z-axis bracket with the four positioning holes
on the printing build plate. (See below pictures)
7. Rotate the four units hand screw down to ensure that the printing build plate is
completely attached to the bottom surface of the vat without sloshing (see the
picture below).
Содержание 3D TALK DS200
Страница 1: ...Jiangsu Ouring 3D Technology co Ltd 1 User Guide of 3D TALK DS200 Version V3 0 ...
Страница 21: ...Jiangsu Ouring 3D Technology co Ltd 21 2 choose the software storage path Everyone Next ...
Страница 22: ...Jiangsu Ouring 3D Technology co Ltd 22 3 Click Next button ...
Страница 39: ...Jiangsu Ouring 3D Technology co Ltd 39 Set up the print profile The configuration file sets the path ...
Страница 40: ...Jiangsu Ouring 3D Technology co Ltd 40 The figuration file sets the content ...
Страница 41: ...Jiangsu Ouring 3D Technology co Ltd 41 ...
Страница 54: ...Jiangsu Ouring 3D Technology co Ltd 54 ...