
B_EU_EMP_en.doc
ÖSTLING Markiersysteme GmbH
Operation manual EMP
16
3.2 Setting up the EMP or MODULMAT
EMP
Note
The connections for the cables on the back of the equipment are equipped with
an isolating head. Both cables with plug can be tucked in and cables with
suitable lugs can be tightened.
1
Throttle cylinder speed
2 Pressure
gauge
3
Stencil holder X-Y-Z
4 Marking
head
5
Stencil glued on stencil cover
6 Adjustment
block
7
Connection negative cable
8
Cable and plug magnet valve
9
Pressure reducing valve
10 Compressed air connection
11 Electrolyte storage vessel
Connections EMP
Fig. 10124