SECTION 3 - MACHINE OPERATION
31215862
3-3
3.5 MACHINE OPERATION
The following control conditions must be met before elevating
the platform:
•
Make sure the Pre-Start Inspection (Section 2) has been
completed, and the machine is safe to use.
•
Check that machine base is level and is set up properly for
operation.
•
Platform swing-in entry gate must be closed and latched
once the operator is in the platform.
•
Ensure Emergency lowering valve is closed.
•
Batteries contain enough voltage to operate the machine.
Check the battery charge indicator located on the ground
control box.
NOTICE
JLG RECOMMENDS THAT THE OPERATOR UTILIZES A FALL RESTRAINT SYSTEM
IN THE PLATFORM WITH A LANYARD ATTACHED TO THE AUTHORIZED LAN
-
YARD ANCHORAGE POINT IN THE PLATFORM.
To
order
go
to
Discount-Equipment.com
Содержание JLG 830P
Страница 20: ...SECTION 1 SAFETY PRECAUTIONS 1 12 31215862 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 43: ...SECTION 3 MACHINE OPERATION 3 14 31215862 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 56: ...T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...