Section 4: Operation
5376000207
4-5
11. Attach the wire rope/cable to the
equipment to be loaded. Always
use V-straps or hook-up chains
to attach the wire rope/cable to
the equipment.
Refer to the
equipment manufacturer’s
manual for correct tie-down
attachment points.
For the
best weight distribution of your
load, make sure the equipment
is loaded onto the deck with the
heavy end forward.
12. Re-engage the winch clutch.
(See Winch Operation,
Sections 4.3 and 4.4)
13. Slowly operate the Winch
Control to remove any slack in
the wire rope/cable.
Maintain a minimum of five (5) wraps of wire rope/cable on the winch
drum at all times. Also maintain a uniform wrap of wire rope/cable on the
drum to avoid crushing of the wire rope/cable.
Always use V-straps or hook-up chains. Never connect the wire rope/
cable hook directly to equipment. Never hook the wire rope/cable back
onto itself because damage to the wire rope/cable will occur.
Always attach the wire rope/cable with the hook pointing up.
Содержание JERR-DAN 20NGADF6T-LP
Страница 3: ...Revision Log 5376000207 a REVISION LOG January 13 2020 A Original Issue of Manual...
Страница 8: ...Read This First f 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 22: ...Section 1 General Safety Practices 1 12 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 42: ...Section 3 Controls Indicators 3 8 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 106: ...Section VII Specifications 7 6 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 107: ...Inspection Maintenance and Repair Log Serial Number Date Comments...
Страница 108: ...Inspection Maintenance and Repair Log Date Comments...
Страница 110: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 111: ......
Страница 112: ...www jerr dan com 5376000207 13224 Fountainhead Plaza Hagerstown MD 21742 Phone 717 597 7111 Phone 800 926 9666...