Section 4 : Operation
4-8
5376000207
21. Slide the deck completely
forward until it engages the hold
downs and into the transport
position.
22.
Remove the wheel chocks from
the carrier’s rear tires.
23.
Disconnect the power take-off
(PTO). Refer to PTO operator’s
manual.
TTAKE-OFF
AKE-OFF
IN
IN
OU
OU
Always refer to the Operator’s Pre-Transport Checklist located on the
headboard of the deck before transporting. Make sure you have followed
all of the items on the list.
Always use approved tie downs per the equipment manufacturer’s
instructions. Although the winch wire rope/cable should remain attached
to the equipment and taut during transport, never rely on the winch and
wire rope/cable to secure the equipment to the carrier deck.
NEVER TRAVEL
WITH
THE POWER TAKE OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
Содержание JERR-DAN 20NGADF6T-LP
Страница 3: ...Revision Log 5376000207 a REVISION LOG January 13 2020 A Original Issue of Manual...
Страница 8: ...Read This First f 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 22: ...Section 1 General Safety Practices 1 12 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 42: ...Section 3 Controls Indicators 3 8 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 106: ...Section VII Specifications 7 6 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 107: ...Inspection Maintenance and Repair Log Serial Number Date Comments...
Страница 108: ...Inspection Maintenance and Repair Log Date Comments...
Страница 110: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 111: ......
Страница 112: ...www jerr dan com 5376000207 13224 Fountainhead Plaza Hagerstown MD 21742 Phone 717 597 7111 Phone 800 926 9666...