34
OPERATING & INSTALLATION INSTRUCTIONS FOR STRATFORD CF ZERO CLEARANCE WOOD HEATER
6.3.3
Heat Distribution Systems Installation (AC01389 or AC01339)
Different heat distribution systems can be installed with the Stratford CF:
The hot air gravity distribution kit – modern style with adjustable pipes (AC01389)* is
mandatory
on the
Stratford CF:
You can also install the optional
forced air distribution kit (AC01339)* (see
Appendix 1:
Optional Forced Air
Distribution Kit (AC01339)*
).
* The forced air distribution kit (AC01339) with heat activated system is sold separately and can be
installed only with the hot air gravity distribution kit - modern style with adjustable pipes (AC01389).
C
D*
305 mm MINIMUM
203 mm MINIMUM
* The measurement between the cross member and
the hot air register applies for the bottom and the
top of the hot air register.
C
D
305 mm MINIMUM
1.52 m MINIMUM
(E)
= non-combustible material