
PREPARATION AND SETUP
1TRIPR II Row Units OM-EN
4-11
Dry Mole Shank Assembly
An adjustable dry fertilizer boot (5) can be used in
combination with an adjustable liquid fertilizer tube (4),
protected by a replaceable wear plate (6) on each side,
allow diverse, precision fertilizer placement at separate
depths. Boot options available in 1.5 inch or 2 inch.
ORM000274
Figure 4-9: Boot (2 inch)
For liquid fertilizer tube and boot installation, see “Mole
Shank Assembly Fertilizer Tube Installation” on
page 4-13 and see “Dry Mole Shank Assembly Fertilizer
Tube and Dry Boot Installation” on page 4-15.
For liquid fertilizer tube and dry boot adjustments, see
“Adjustable Liquid Tubes” on page 5-18 and see
“Adjustable Dry Fertilizer Boot on Dry Mole Shank” on
page 5-19.
For tillage shank depth settings, see “Tillage Shank
Depth Adjustment Chart” on page 5-12.
Air Diffuser Installation
The air diffuser can be mounted on either side of the row
unit tail. The air diffuser is designed to work with an input
hose size of 2 in (5 cm) inside diameter. The output hose
size is 1-1/4 in (3.2 cm) inside diameter to match up with
the adjustable dry fertilizer boot.
1. Install air diffuser (3), bolts (1), and nuts (2) as shown
2. Tighten bolts to proper torque. See “Torque
ORM000283
Figure 4-10
1) Roll pin
5) Dry fertilizer boot
2) Height adjustment hole
(11 used)
6) Replaceable wear
plate (2 used)
3) Shank
7) Foot piece
4) Liquid fertilizer tube
4
3
5
6
7
1
2
1) Bolt (2 used)
3) Air diffuser
2) Nut (2 used)
2
1
3
Содержание 125-082-01-EN-OM
Страница 1: ...Operator s Manual 1TRIPR II ROW UNITS Part 125 082 01 EN OM Rev A ...
Страница 2: ...Intentionally Left Blank Page ...
Страница 6: ...1TRIPR II Row Units OM EN TOC iv Page Intentionally Blank ...
Страница 22: ...SAFETY INFORMATION 1TRIPR II Row Units OM EN 2 12 Page Intentionally Blank ...
Страница 28: ...MAJOR COMPONENTS 1TRIPR II Row Units OM EN 3 6 Page Intentionally Blank ...
Страница 70: ...OPERATION AND FIELD SETTINGS 1TRIPR II Row Units OM EN 5 24 Page Intentionally Blank ...
Страница 74: ...TROUBLESHOOTING 1TRIPR II Row Units OM EN 6 4 Page Intentionally Blank ...
Страница 82: ...MAINTENANCE AND SPECIFICATIONS 1TRIPR II Row Units OM EN 7 8 Notes ...