
PREPARATION AND SETUP
1TRIPR II Row Units OM-EN
4-3
Preparing the 1tRIPr® II Row Unit
1. Read and understand the operator’s manual for all
tooling options used in conjunction with the
1tRIPr® II Row Units. See “Tooling Options” on
page 4-4.
2. Make all necessary tooling adjustments prior to field
use. See “Field Adjustments” on page 5-4.
3. If an Orthman toolbar is used in conjunction with
1tRIPr® II Row Units, be sure to consult the toolbar
operator’s manual before attempting to operate the
implement. Read and understand the operator
manuals for all machinery used in conjunction with
the 1tRIPr® II.
4. Make sure that all decals are in good, clean, and
legible condition. Make sure each decal is correctly
placed according to the safety section of this
operator’s manual. See “” on page 2-9 for more
information.
5. Be sure to lubricate all grease points on machine.
See “Lubrication” on page 7-4.
6. Before each use, check all hardware for wear and
the proper torque. Replace missing hardware with
hardware of an identical grade in order to restore the
implement to original specifications. See “Implement
Inspection” on page 7-4.
Implement-to-Tractor Connection
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Make sure all personnel
are clear of the implement before lowering.
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Do not stand between
the tractor and implement when connecting or
disconnecting the implement.
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Use bar stands and
cylinder stops to support the implement.
Store the implement on a clean, dry, level surface. An
uneven surface could cause the implement to shift or fall,
resulting in injury or death as well as implement damage.
Securely support all implement components that must be
raised.
If an Orthman toolbar is used in conjunction with
1tRIPr® II Row Units, be sure to consult the toolbar
operator’s manual for implement-to-tractor connection
procedures.
See the tractor operator’s manual for more information
on properly connecting the implement.
Содержание 125-082-01-EN-OM
Страница 1: ...Operator s Manual 1TRIPR II ROW UNITS Part 125 082 01 EN OM Rev A ...
Страница 2: ...Intentionally Left Blank Page ...
Страница 6: ...1TRIPR II Row Units OM EN TOC iv Page Intentionally Blank ...
Страница 22: ...SAFETY INFORMATION 1TRIPR II Row Units OM EN 2 12 Page Intentionally Blank ...
Страница 28: ...MAJOR COMPONENTS 1TRIPR II Row Units OM EN 3 6 Page Intentionally Blank ...
Страница 70: ...OPERATION AND FIELD SETTINGS 1TRIPR II Row Units OM EN 5 24 Page Intentionally Blank ...
Страница 74: ...TROUBLESHOOTING 1TRIPR II Row Units OM EN 6 4 Page Intentionally Blank ...
Страница 82: ...MAINTENANCE AND SPECIFICATIONS 1TRIPR II Row Units OM EN 7 8 Notes ...