
PREPARATION AND SETUP
1TRIPR II Row Units OM-EN
4-6
Row Unit Set-Back Clamp
Row unit set-back clamps are recommended on
1tRIPr® II machines set at 22 inch row spacing and
become necessary on machines set at 20 inch row
spacing. Row unit set-back clamps are typically installed
on every other row unit across the machine.
Mounting Set-Back Clamp
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Make sure all personnel
are clear of the implement before lowering.
DANGER
!
Avoid crushing. An uneven surface could cause the
implement to shift or fall, resulting in injury or death as
well as implement damage. Park the implement on a
clean, dry, level surface.
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Use bar stands and
cylinder stops to support the implement.
1. Lower the implement to the ground, place the tractor
in park, turn off the engine, and remove the key.
2. Remove buildup of grease, oil, and debris prior to
installing row unit mounts. See “Implement
Inspection” on page 7-4.
3. Remove row unit from traditional mount at front of
parallel linkage. See “Mounting Row Unit” on
page 4-4.
4. Install row unit set-back clamp (1) and hand tighten
clamp bolts (4).
5. Use adjustment bolts (3) and washers (as needed)
(5) to set the hole to hole distance of 14 in (35.7 cm)
(6).
6. Tighten set-back clamp bolts and adjustment bolts to
proper torque. See “Torque Specifications” on
page 7-2.
7. Install row unit parallel linkage (2) to set-back clamp.
Tools
• 1-1/8 in Wrench
• 1-1/8 in Impact socket
• Impact wrench
• 3/4 in Washer (as needed)
Содержание 125-082-01-EN-OM
Страница 1: ...Operator s Manual 1TRIPR II ROW UNITS Part 125 082 01 EN OM Rev A ...
Страница 2: ...Intentionally Left Blank Page ...
Страница 6: ...1TRIPR II Row Units OM EN TOC iv Page Intentionally Blank ...
Страница 22: ...SAFETY INFORMATION 1TRIPR II Row Units OM EN 2 12 Page Intentionally Blank ...
Страница 28: ...MAJOR COMPONENTS 1TRIPR II Row Units OM EN 3 6 Page Intentionally Blank ...
Страница 70: ...OPERATION AND FIELD SETTINGS 1TRIPR II Row Units OM EN 5 24 Page Intentionally Blank ...
Страница 74: ...TROUBLESHOOTING 1TRIPR II Row Units OM EN 6 4 Page Intentionally Blank ...
Страница 82: ...MAINTENANCE AND SPECIFICATIONS 1TRIPR II Row Units OM EN 7 8 Notes ...