IG-310-EN version 01; 31/03/2021
60
Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
b.
Insert the feeder disconnector operating lever
(BLACK knobs) in the bottom feeder disconnector
actuating shaft (area marked with WHITE line).
Figure 7.76.
Lever inserted in the bottom feeder disconnector actuating
shaft
c.
Turn the lever ANTICLOCKWISE until final actuator
position is reached.
Figure 7.77.
Bottom feeder disconnector open, after turning the lever
Содержание cpg.0 lite
Страница 91: ......