IG-310-EN version 01; 31/03/2021
59
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
Operations sequence
7.3.2. Busbar decoupling operation
Starting position:
circuit-breaker CLOSED, spring
charging status indicator shows UNCHARGED,
top feeder disconnector CLOSED, bottom feeder
disconnector CLOSED, top earthing switch OPEN, and
bottom earthing switch OPEN.
Check that the SF
6
level is correct before starting the
operation
1.
Open the circuit-breaker. Press the "O" pushbutton. The
circuit-breaker status indicator shows OPEN.
Figure 7.74.
Circuit-breaker open
2.
Open the bottom feeder disconnector.
a.
Move its selector switch to the right, to feeder
disconnector position.
Figure 7.75.
Selector switch in feeder disconnector position