Ormandy Optimajor GLP S 3.0 Скачать руководство пользователя страница 19

Page

19 / 19

7. Maintenance

Maintenance of the boiler must be carried out once or twice per year, according to the conditions of use, by means of an
inspection of the cleanness of the flues. In order to do this, one must simply open the cast-iron door and work in this order:
first clean the horizontal flues, then proceed to the vertical flue sections and finally clean the combustion chamber.

Abnormal soiling of the furnace may be the result of :

- derangement of the burner
- obstruction of the chimney

It is recommended to have the regulation of the burner, the combustion characteristics and the proper functioning of the control
apparatus checked annually (by the filter).

8. Guarantee conditions for Saint Roch Couvin's products

1. Our products are guaranteed against all manufacturing defects, insofar as they have been used in normal conditions and

have been installed and maintained in the approved manner, according to prevailing regulations and in accordance with
the prescriptions of our technical services.
Our technical instructions must be adhered to and annual maintenance be undertaken by a qualified person.
Our guarantee does not cover damage to boilers which have been used with polluted air including corrosive elements such
as chlorine, fluorine, sulphur etc. The use of water which is found to be unsuitable would also invalidate our guarantee.

2. Our guarantee specified below commences on the date of delivery.

Its duration being as follows :
- Cast-iron block (i.e. the whole of the apparatus composing the heating block of the appliance): 3 years
- All other accessories and pieces of equipment supplied with the boiler are subject to individual manufacturers garantee.

3. The guarantee is restricted to either the repairing or the simple replacement - at our discretion - of any component sent

to our registered office free of charge and which we recognize to be defective, with the exclusion of any labour costs,
transport or travelling expenses and any damages or compensation whatsoever.

4. The replacement or repair of a component in the course of the period of guarantee will never result in the extension of this

period.

5. We will not accept any costs on account of the installation, which is entirely the responsability of the installer. Any visit

to site for any of the above reasons may be construed only as technical assistance and no way binding the manufacturer.

6. The manufacturer reserves the right to modify the technical and aesthetic characteristics of its products without notice.

7. For full details, please refer to our Term and Conditions of sale.

Содержание Optimajor GLP S 3.0

Страница 1: ...Optimajor GLP S EXPORT OPTIMAJOR GLP S EXPORT 0111 00 OIL GASFIRED CENTRALHEATINGBOILER TECHNICALANDMAINTENANCEINSTRUCTIONS...

Страница 2: ...6 Spare parts 18 7 Maintenance 20 8 Guarantee conditions on Optimajor GLP S 20 Page Contents User s advices The boiler must be installed and commissioned by a registered installer in accordance with...

Страница 3: ...e calculated and carried out according to the standards in force the local obligations and the regulations of the manufacturer The hydraulic installations fuel or gases will be established according t...

Страница 4: ...48 1 84 7 60 3 101 9 72 5 119 84 7 136 2 96 6 153 3 109 2 Combustion circuit vol dm Water side losses mbar 1 7 0 9 2 7 1 4 3 9 2 5 3 2 7 6 9 3 5 8 7 4 4 Relative standby loss Water capacity l Packed...

Страница 5: ...edition of Clean Air Act 1993 should be observed To ensure safe operation of the boiler the chimney system shall be capable of the complete evacuation of the products of combustion at all times The e...

Страница 6: ...the thermal insulation and the mantle No leakage must occur during the water test Positioningthebottomrearfixingplate A onthecastiron block on the rear section Using2M8X10 DIN933 screw blocktherearpla...

Страница 7: ...ount the overall dimensions of the jacket Provide a coupling duct with a diameter of 200 mm Height of the axis of the duct 670 mm not including the base Place the chimney coupling duct Ensure the airt...

Страница 8: ...e filling of the heating circuit Verify and check the watertightness of all connections Rinse the installation by empying it Bring the pressure up to the level in accordance with the manometric height...

Страница 9: ...mp to ensure a difference of temperature between the start and return oftheboilerofminimum5 Cand ofmaximum35 C Beforeinstallingadevice itishighlysuggestedthattheinstallercheckstheconditionsofthechimne...

Страница 10: ...arenotpartofthescopeof our supply but are mentioned because requiredforagoodplantperformance If all the plant radiators are equipped with thermostatic valves a differential pressure valve should be pl...

Страница 11: ...f the hydraulic circuits is ensured apply the following sequence for the filling of the hot sanitary water circuit Z Z The fillingmust takeplace slowly the draincocksbeing openorunscrewed inorderto av...

Страница 12: ...age again Remark As far as Ecosets are concerned are the electrical connections of the circula tionpumpoftheheatingcircuitmadein the control box outisde the boiler control panel 4 3 Electricalconnecti...

Страница 13: ...ago range Climaticregulator delivered in option Lago Eco Lago E8 0634 In order to install this regulation it is necessary to interpose between the boiler connector block and the regulator a connection...

Страница 14: ...plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator AFS external pr...

Страница 15: ...P 12 poles plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator KFS b...

Страница 16: ...cuit USING LIGHTING put the boiler under tension via the main switch set the boiler thermostat at the desired temperature after a temperature setting of the installation make again a general purging a...

Страница 17: ...Page 17 19 6 Spare parts list Boiler Cast ironblock 20 21 26 12 11 10 13 14 15 16 17 19 18 23 24 25 22 32 37 36 38 30 34 33 31 32 31 35...

Страница 18: ...7 0 1 80 600 80940 22 4 M16 x 1060 tie bar n 8 0 1 80 600 81060 23 1 Reducing plug 1 1 4 3 4 1 60 110 10061 24 4 Plug 1 1 4 with square hole fig 596 1 60 100 30010 25 2 Eye bolt 1 80 121 10063 26 acc...

Страница 19: ...uted airincludingcorrosiveelementssuch as chlorine fluorine sulphur etc The use of water which is found to be unsuitable would also invalidate our guarantee 2 Our guarantee specified below commences o...

Отзывы: