2.
Lower the leveling feet to the floor as shown in
wrench. When lowered correctly, the four leveling feet should support the full
weight of the Exalogic machine.
Figure 3-3 Securing Exalogic Machine Using the Leveling Feet
3.2.6.4 Stabilize the Exalogic Machine with Mounting Brackets
The rack can be permanently mounted to the installation site floor using the same
mounting brackets that secured the rack to the shipping pallet. The rack is secured to
the pallet with four mounting brackets. Use the front and rear brackets to stabilize the
rack to the installation floor. Prepare the installation site by drilling four holes into the
floor. Before permanently stabilizing the Exalogic machine with the mounting
brackets, pre-drill the mounting holes.
shows the location and dimensions
of the mounting brackets.
Prepare to Install an Exalogic Machine
3-8 Oracle Exalogic Elastic Cloud Machine Owner's Guide
Содержание Exalogic Elastic Cloud
Страница 12: ...xii ...
Страница 70: ...Default Port Assignments 4 16 Machine Owner s Guide ...
Страница 82: ...Initial Network Configuration of Exalogic Machine 5 12 Machine Owner s Guide ...
Страница 102: ...Network Configuration Worksheets 6 20 Machine Owner s Guide ...
Страница 112: ...What Next 7 10 Machine Owner s Guide ...
Страница 134: ...Use the Phone Home Service to Manage the Storage Appliance 8 22 Machine Owner s Guide ...
Страница 162: ...Oracle Solaris Creating VNICs and Associating Them with VLANs 11 6 Machine Owner s Guide ...
Страница 248: ...Using Oracle Services in Oracle Enterprise Manager Ops Center 17 34 Oracle Exalogic Elastic Cloud Machine Owner s Guide ...
Страница 250: ...Using Oracle Services in Oracle Enterprise Manager Ops Center 17 36 Machine Owner s Guide ...
Страница 324: ...Power Distribution Unit Cabling Tables E 32 Machine Owner s Guide ...
Страница 338: ...Migrate a Zone to a New Host F 14 Machine Owner s Guide ...
Страница 342: ...Install Update and Remove RPMs Using Yum G 4 Machine Owner s Guide ...