optris PI LightWeight Kit
– E2013-04-B
45
Step 3:
After the complete system recovery the NetBox will be automatically shut down and switched off (all LEDs
are off). Now you should disconnect for a short time the power (disconnect the power supply). After
reconnecting power and booting of the system you should see the following message:
Please press Next
Select Random SID and then Next
Step 4:
In the next window you can rename the NetBox (optional). Please note that the new name should have at
maximum 15 characters.
Press two times
Next
. Now the system will be shut down again.
Your NetBox is now ready for use again.
Содержание PI 400 LW
Страница 2: ......
Страница 10: ...optris PI LightWeight Kit E2013 04 B 8...
Страница 13: ...optris PI LightWeight Kit E2013 04 B 11 Dimensions PI 400 LW PI 450 LW...
Страница 14: ...optris PI LightWeight Kit E2013 04 B 12 Dimensions PI NetBox LW...
Страница 48: ...optris PI LightWeight Kit E2013 04 B 46 Rename the NetBox optional...