optris PI LightWeight Kit
– E2013-04-B
15
After powering the NetBox LW the system will boot and is ready after 2-3 minutes. A video monitor which is
connected to the system will show then the IR live picture of the camera in full screen mode.
Start a Recording
At the backside of the IR camera you will find a red sliding switch. To start a recording please move the
switch into the
right position
.
If you move the switch back into the left position the recording will be stopped.
Содержание PI 400 LW
Страница 2: ......
Страница 10: ...optris PI LightWeight Kit E2013 04 B 8...
Страница 13: ...optris PI LightWeight Kit E2013 04 B 11 Dimensions PI 400 LW PI 450 LW...
Страница 14: ...optris PI LightWeight Kit E2013 04 B 12 Dimensions PI NetBox LW...
Страница 48: ...optris PI LightWeight Kit E2013 04 B 46 Rename the NetBox optional...