background image

KRM-X® Duct Smoke Detector

2

 | 

10

  |  Fire Protection  |  Data sheet No. 41350  |  Version 01-2019 

power supply  
230 V AC

test/reset
(NC contact)

9

10
11
12
13
14
15

green

16
17

yellow

blue 

smoke alarm

smoke alarm

service signal

contamination

red

test/reset

3
4

power supply  

230 V AC 

1
2

KRM-1

10

1

2

3

4

5

6

7

8

9

11

12

13

15

Electrical connection

10

9

11

12

13

14

  1   Adapter plate with gasket
  2   Patented measuring tube
  3   End cap
  4    Rubber bushing  

(only for insulated or circular ducts)

  5   Housing base with gasket
  6   Electronics
  7   Optical smoke detector
  8   Housing top with gasket
  9   LED red:  

alarm/reset button

 10   LED yellow:   failure
 11   LED display:  sensor contamination in %
 12   LED green:   in operation
 13   LWD blue:   airflow below 1 m/s
 14   Opening for test gas
 15   Air duct

All contact diagrams are shown 
in the power-off state  
(alarm) / contamination > 70%

optional informative  
RS 485 bus interface
(see KRM-X-2-MOD/-BAC)

Remote reset/test (terminal 9 +10): if bridge circuit is removed,  
a floating NC contact must be connected.

Note: The floating switching contacts (terminals 11 – 17) should be 
assigned as uniformly as possible to an installation category  
according to EN 60730-1. These switching contacts are to be used for 
230 V AC only for or 24 V AC / DC only. Combinations are not permit-
ted unless at least one contact between different potentials remains 
unassigned. Mixed configurations of safety extra-low voltage 
(SELV) and low voltage are not allowed. The assembly may only be 
operated on one mains phase. Disconnection / Electrical protection 
equipment must be provided by the customer. 
KRM-X.-1-xx (230 V versions) with a fuse of 16 A; 
KRM-X-2-xx (24 V versions) with 4 A.

KRM-X-2, 24 V

KRM-X-1, 230 V

KRM-X-2-MOD, 24 V
KRM-X-2-BAC, 24 V

power supply  
24 V AC/DC

test/reset
(NC contact)

9

10
11
12
13
14
15

green

16
17

yellow

blue 

smoke alarm

smoke alarm

service signal

contamination

red

test/reset

3
4

power supply  

24 V AC/DC 

1
2

KRM-2

power supply  
24 V AC/DC

test/reset
(NC contact)

9

10
11
12
13
14
15

green

16
17

yellow

blue 

smoke alarm

bus B
bus B
bus A
bus A

smoke alarm

service signal

contamination

red 

test/reset

3
4
5
6
7
8

power supply  

RS485 

(informative)

power supply 

24 V AC/DC 

1
2

KRM-2-MOD

Содержание KRM-X

Страница 1: ...S485 MOD BAC only Accessories Mounting bracket KS X for insulated circular ducts KS X for insulated circular ducts in combination with WDG X Housing WDG X protective insulating housing with alarm disp...

Страница 2: ...nected Note The floating switching contacts terminals 11 17 should be assigned as uniformly as possible to an installation category according to EN 60730 1 These switching contacts are to be used for...

Страница 3: ...ng segment display 00 99 Contamination in Flashes starting at 70 contamination relay drops out at 99 the alarm LED alarm lights up Failure E g smoke detector missing communication with smoke detector...

Страница 4: ...when airflow is too low and air relay only present on DIBt versions drops out Check smoke detector position in the duct check sampling tube TurboTube for contamination and clean if necessary Programm...

Страница 5: ...unting bracket this makes it possible to mon itor ducts up to 100 mm There is no maximum width height or diameter for air ventilation ducts monitored with the 600 mm long standard air collecting tube...

Страница 6: ...structurally possible If the positioning recommendations cannot be followed for structural reasons the KRM X should be mounted such that reliable smoke detection and airflow are nonetheless ensured T...

Страница 7: ...lel to the flow direction Four self tapping screws not included in delivery serve for attaching the adapter plate to the sheet metal duct 4 Installation on the duct Rectangular air duct see picture on...

Страница 8: ...The green LED 12 lights up Press the alarm reset button 9 to perform a simple initial functional test All LEDs must light up and all relays drop out The units con nected to the relays are activated T...

Страница 9: ...ive to smoke while work is in progress If a brief shutdown cannot be cannot be tolerated for operational reasons measures must be taken to prevent a shutdown If necessary a bridge can be placed over t...

Страница 10: ...eturn to its normal function and does it unlock again from the smoke alarm state and return to its normal function when the alarm has been reset Does the detector return to the alarm state and lock up...

Отзывы: