Strana 11 31. 3. 2016
11
b) Installing fireclay lining and the secondary pipe:
Because the fireclay lining could get damaged during transportation, these fitting are delivered in a
separate package. After the boiler is placed in its location and connected to the given system, insert
the fireclay fittings in it in accordance with Picture E. Do so in the marked numerical order, i.e. 1, 2,
3 and so on. Insert the secondary pipe as third WITH THE HOLES FACING UP. When you insert
the last fitting, i.e. fitting number 8, push it against fitting number 7 in a way as to make sure they
are touching each other with their edges. Be careful not to damage the fireclay fittings during
installation.
Insert the fittings one by one in the appropriate numerical order, i.e. 1, 2, 3 and so on:
Picture E
1
2
3
4
5
6
7
8