
60
Operating the System
Eagle Operator Manual
OPEX Corporation
4.5.4.1.1. Overall System Performance Measures
The Overall System Performance Measures section (Figure 4-15) displays the
information the rates and clear times for the current job.
Figure 4-15: Overall System Performance Measures
This section displays the following information:
Input
Number of envelopes the system has started to process.
Feed Rate
Number of envelopes per hour the system is currently feeding.
The formula for the Feed Rate is:
Output Rate
Number of envelopes per hour the system is processing. The
formula for the Output Rate is:
Jam Clear Time
Time it takes the operator to clear the jam. The formula for
the Jam Clear Time is:
Jam Rate
Number of jams per run. The formula for the Jam Rate is:
Содержание Eagle Remittance Processor
Страница 10: ...10 Introduction Eagle Operator Manual OPEX Corporation This page is intentionally blank...
Страница 18: ...18 Safety Eagle Operator Manual OPEX Corporation This page is intentionally blank...
Страница 96: ...96 Eagle Operator Manual OPEX Corporation This page is intentionally blank...
Страница 97: ...B Eagle Operator Manual B Outsorts Reunites and Rejects B 1 Outsorts 98 B 2 Reunites 100 B 3 Rejects 102...
Страница 103: ...G Eagle Operator Manual Glossary G 1 List of Acronyms 104 G 2 List of Terms 105...
Страница 108: ...OPEX Corporation 305 Commerce Drive Moorestown NJ 08057 4234 USA http www opex com...