Seite 66 von 128
CAUTION:
The UPS output sockets are now live. This is indi-
cated by the LINE and BYPASS LEDs.
8.1 Tower installation
8.1.1 UPS single tower installation
Please use the baseplates included in the scope of supply.
Remove them from the carton and assemble them as shown
below.
Figure 9: Baseplate for tower installation
After assembling the two separate components, please posi-
tion the UPS on the baseplates as shown below.
Figure 10: Positioning the UPS
Содержание XANTO RT1000
Страница 1: ...www online ups com Manual XANTO RT Series RT 1000 RT 2000 RT 3000 ...
Страница 3: ...Seite 2 von 128 ...
Страница 45: ...Seite 44 von 128 ...
Страница 85: ...Seite 84 von 128 ...
Страница 87: ...Seite 86 von 128 ...
Страница 129: ...Seite 128 von 128 ...