Oneida Air Systems, Inc.
14
Assembly Instructions (Continued)
FIG. 17
FIG. 18
FIG. 16
G11
B
C
C
C
E
E
D
G7
16
Place the Filter (C) on top of the Cyclone (E)
with the open side facing down [FIG. 16].
Note: Position the Filter (C) on the Cyclone (E)
so that is centered between all four Hex Head
Bolts (G8).
17
Slide the Filter Hold-Down Ring (B) over the
Filter (C) and the previously installed bolts
(G7) and secure in place using four Nylock
Nuts (G11) [FIG. 17].
Note: Tighten hardware so that the Filter's pre-
installed foam gasket is firmly compressed (by
roughly 50%).
18
Open and slide the Ring Clamp (D) over the
assembly so that it rests outside the upper
flange of the Cyclone (E) [FIG. 18].
Содержание Supercell XSK000014
Страница 2: ......
Страница 31: ...oneida air com 29 Notes...