EVBUM2789
4
The evaluation board duplicates most important signals on test points to the user.
Table 3. TEST POINT
Test Points
Description
TP1
EN: Hardware Enable
•
EN = LOW: NCV91300 is disabled
•
EN = HIGH: NCV91300 is enabled
TP2
SYNC signal
TP3
PG: Power Good Signal
•
PG = LOW: Output voltage out of range
•
PG = HIGH: Output voltage in range
TP4
SDA: I
2
C Data signal
TP5
SCL: I
2
C Clock signal
TP6
SW: DC to DC converter switching node
TP7
INTB: Interrupt Signal
•
INTB = LOW: Interrupt detected
•
INTB = HIGH: No interrupt
TP8
PGND sense
TP9
PVIN Sense
TP10/TP11
Feedback loop for bode measurements (across R7)
TP12/TP13
VOUT: Output voltage sense (across C17)
TP14
Gate of the Q1 transistor used for Load Transient
TP15
AVIN Sense
TP16
Iout force
Setup
The following steps should be followed before the
Evaluation Board is operated
1. Install the Graphical User Interface (GUI)
Software on computer
2. Connect the Interface Board to the Board, using
the ribbon cable or board to board connectors
3. Connect Output Voltage and Loads (if any) to the
board
4. Configure all jumpers to Default Settings
5. Connect the interface board to computer with USB
cable
6. Connect NCV91300 Board 2.5 V~5.5 V (See
table 1) power supply to J3/J8 (J5) and J1/J8
connectors, pay attention to polarity of power
supply and the V clamp of the power supply.
7. Turn power supply on
8. Run the NCV91300 Graphical User Interface
Software