![background image](http://html.mh-extra.com/html/omron/v600-series/v600-series_user-manual_743003059.webp)
57
RFID System
Operation Manual
Se
ct
io
n 3
Te
st
O
p
er
ati
o
n
Section 3
Preparing Communications
Test Operation
Power turned ON.
Test operation of external
I/O terminal functions.
• Check the power supply voltage and power supply terminal connections.
• Check the power supply voltage to the I/O terminals.
• Check the POWER indicators on the ID Controller and Read/Write Head.
• Confirm that operation stops for the reset input.
• Check status for trigger inputs in I/O Display Mode.
• Test communications between the Data Carriers and I/o Controller
without connecting to the host device.
• Text communications between the host device and ID Controller with
the TEST command.
• Test the entire system using actually commands and I/O status.
Perform offline tests in
MAINTENANCE mode.
Perform online tests
with the host device.
Test system operation.
End.
Содержание V600 Series
Страница 1: ...RFID System V600 Series User s Manual Man No Z239 E1 03A ID Controller V600 CA5D01 V600 CA5D02 ...
Страница 22: ...20 Section 1 Overall Flow of Application RFID System Operation Manual Section 1 Product Overview MEMO ...
Страница 50: ...48 Section 2 Wiring RFID System Operation Manual Section 2 Installation and Wiring MEMO ...
Страница 72: ...70 Section 4 Write Command Memory RFID System Operation Manual Section 4 Function ...
Страница 138: ...136 Section 5 End Codes RFID System Operation Manual Section 5 Communications MEMO ...
Страница 150: ...148 Section 6 Troubleshooting Flowcharts RFID System Operation Manual Section 6 Troubleshooting MEMO ...