7
System Configuration
Section 1-2
The number of Units that can be mounted in a CPU Rack or Expansion Rack
depends on the capacity of the Rack’s Power Supply Unit and the current con-
sumption of the other Units in the Rack.
The following table shows the maximum number of CJ1W-TC
@@@
Tempera-
ture Control Units that can be mounted in a Rack if the Temperature Control
Units are the only Units being used in the Rack.
Note
I/O words are allocated to the Special I/O Units based on the unique unit num-
ber set on the front of each Unit.
Installation Procedure
Use the following procedure to install the Temperature Control Unit. The PLC
must be removed from the DIN Track in order to connect a Temperature Con-
trol Unit.
1,2,3...
1.
Align the Units and connect them together so that the connectors join
smoothly and completely.
2.
Slide the yellow latches on the top and bottom of the Unit until you hear the
latches click and lock the Units together.
3.
Install an End Cover on the rightmost Unit.
Precautions
The Unit’s functions may not be completely operational if the latches are not
locked securely.
Power Supply Unit
CJ1W-TC
@@@
CJ1W-PA205R
10 Units
Hooks
Connector
Openings for hooks
Slide latches back until they lock.
(The latches will click when they lock.)
Release
Lock
Sliding
latch
Содержание Sysmac CJ Series
Страница 1: ...OPERATION MANUAL Cat No W396 E1 03 SYSMAC CJ Series CJ1W TC Temperature Control Units...
Страница 2: ...CJ1W TC Temperature Control Units Operation Manual Revised December 2005...
Страница 3: ...iv...
Страница 5: ...vi...
Страница 13: ...xiv...
Страница 23: ......
Страница 93: ......
Страница 105: ......
Страница 107: ......
Страница 113: ......
Страница 115: ......