3 - 27
3 Operation
Grid Connect Photovoltaic Inverter KP100L-OD-
USER’S MANUAL
3-6 Setting
in Particu
lar Co
untries
3
9
Detect level of Each Country
The detect level (default value) of each country is the following. These level are set under consideration of
regulation value , tolerance, and detection time.
The detect level cannot be changed excluding the OF/UF level of Italy and the OV level of Germany.
*1 Before connecting the grid, it is examined if the voltage and frequency of the grid remains within the tolerance area
pursuant to VDE0126-1-1 4.2.1, 4,2,2 and 4.3 for 30 seconds. The connection and feeding cannot be carried out unless
voltage and frequency of the grid remain within the tolerance pursuant to VDE0126-1-1 4.2 and 4.3 for 5 seconds.
*2 Before connecting the grid, it is examined if the voltage and frequency of the grid remains within the tolerance for 30
seconds.
"The detect level" and "the detect time" of "OF" and "UF" of South Africa are the master value. In the design,
"OF", and "UF" are detected by following "the detect level" and "the detect time".
Set value item Germany
Spain
Italy
France
Greece
Czech
Denmark
Portugal
Turkey
RSA
OV Level [V]
253.00
253.00
276.00
264.50
253.00
264.50
253.00
253.00
253.00
249.80
Time [s]
0.15
4.90
0.10
0.15
0.45
0.15
0.15
4.90
0.15
599.90
UV
Level [V]
184.00
195.50
184.00
195.50
176.00
195.50
184.00
195.50
184.00
209.60
Time [s]
0.15
4.90
0.20
0.15
0.45
0.15
0.15
4.90
0.15
599.90
OF
Level [Hz] 50.15
50.90
50.30
50.50
50.50
50.50
50.15
50.90
50.15
51.45
Time [s]
0.15
4.90
0.10
0.15
0.45
0.15
0.15
4.90
0.15
59.90
UF
Level [Hz] 48.50
49.10
49.70
49.50
49.50
49.50
48.50
49.10
48.50
48.55
Time [s]
0.15
4.90
0.10
0.15
0.45
0.15
0.15
4.90
0.15
59.90
Reconnection
time [s]
5.5(*1)
180.5
(*2)
20.5
5.5(*1)
180.5
(*2)
5.5(*1)
5.5(*1)
180.5
(*2)
5.5(*1)
5.5(*1)
Set value item
Level[Hz]
Time[s]
OF
51.45 or more
Within 59.9
51.95 or more
Within 9.9
53.95 or more
Within 0.9
UF
48.55 or less
Within 59.9
48.05 or less
Within 9.9
47.55 or less
Within 5.9
46.05 or less
Within 0.9
Содержание KP100L-OD - 12-2010
Страница 18: ...17 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 21: ...20 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 33: ...1 Overview 1 12 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 63: ...2 Design 2 30 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 103: ...4 Maintenance Operations 4 12 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 113: ...6 After Sales Service 6 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 114: ...7 1 7 7 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL 7 1 Standard Specification List 7 2 Specifications ...
Страница 117: ...7 Specifications 7 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 125: ...A Appendix A 8 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...