3 - 7
3 Operation
Grid Connect Photovoltaic Inverter KP100L-OD-
USER’S MANUAL
3-2 Proce
dure a
t th
e First
T
ime Op
er
a
tion
3
9
Procedure of the country setting confirmation
Make sure that the country setting is correct. Refer to the below Figure about the setting.
(1) In the normal display, if you press the MODE key for 5 second, display change to the selection display.
(2) In the selection display, push >> and choose "Check".
(3) After you choose “Check“, push the ENT key.
(4) Display shows the country setting. Make sure the name of a country .
(5) Push the MODE key to return the selection display. After that push the MODE key to return normal
display.
ModeSelect
Setup
[Check] ErrL
Pac 30s
0.00/0.00/0.00kW
Check:Country
GER
Push the MODE key
for 5 second
(1)
(2)
(3)
Push the MODE key
or
No operation for 150seconds
Push the ENT key
Push the MODE key
ModeSelect
ErrLog [Setup] Che
Push
>>
key
Push << key
(4)
Push the MODE key
or
No operation for 150seconds
Содержание KP100L-OD - 12-2010
Страница 18: ...17 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 21: ...20 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 33: ...1 Overview 1 12 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 63: ...2 Design 2 30 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Страница 103: ...4 Maintenance Operations 4 12 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 113: ...6 After Sales Service 6 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 114: ...7 1 7 7 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL 7 1 Standard Specification List 7 2 Specifications ...
Страница 117: ...7 Specifications 7 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Страница 125: ...A Appendix A 8 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...