17
Basic Operating Procedure
Section 1-6
7. Transferring the
Programs
When the programs has been created in the CX-Programmer, they must be
transferred to the Motion Control Modules through the Coordinator Module.
8. Testing Operation
8-a) I/O Wiring Checks
Check Output Wiring
With the FQM1 in PROGRAM mode, force-set and force-reset output bits
from the CX-Programmer and verify that the corresponding outputs operate
properly.
Check Input Wiring
Activate input devices, such as sensors and switches, and verify that the cor-
responding input indicators light. Also, use the Bit/Word Monitor operation
from the CX-Programmer to verify the operation of the corresponding input
bits.
8-b) Trial Operation
Use the CX-Programmer to switch each Module to MONITOR mode.
Using the CX-Programmer
8-c) Monitoring and
Debugging
There are several ways to monitor and debug FQM1 operation, including the
force-set and force-reset operations, differentiation monitoring, time chart
monitoring, data tracing, and online editing.
Force-Set and Force-Reset
When necessary, the force-set and force-reset operations can be used to
force the status of bits and check program execution.
From the CX-Programmer, select the bit to be force-set or force-reset and
then select
Force On
or
Off
from the PLC menu.
Differentiation Monitor
The differentiation monitor operation can be used to monitor the up or down
differentiation of particular bits. Use the following procedure from the CX-Pro-
grammer.
CX-Programmer
Trial Operation
Select
PC - Mode - MONITOR.
Actual operation
Select
PC - Mode - RUN.
FQM1
Coordinator Module
Peripheral
port
Содержание HOME SECURITY SYSTEM - MOTION SENSOR FQM1-CM001
Страница 3: ...iv...
Страница 5: ...vi...
Страница 9: ...x TABLE OF CONTENTS...
Страница 11: ...xii...
Страница 23: ...xxiv Data Backup 5...
Страница 53: ...30 Function Tables Arranged by Purpose Section 1 7...
Страница 71: ...48 Memory Block Diagram Section 2 7...
Страница 254: ...231 Analog Outputs Section 7 10...
Страница 255: ...232 Analog Outputs Section 7 10...
Страница 263: ...240 Connecting the CX Programmer Section 8 2...
Страница 285: ...262 Inspections Section 10 1...
Страница 397: ...374 Auxiliary Area Allocations Appendix D...
Страница 409: ...386 Index...
Страница 411: ...388...